Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 171 of 1442

Add Multi-Factor-Authentication (MFA) to InfoAsset Mobile

This is standard for most applications requiring logins and required by IT departments.
Jim O'Dowd 2 days ago in Other Product Ideas / Asset Management 0 For Review

Ability to access gauge results when results timestep multiplier is 0

If I am trying to access the gauge results (using obj.gauge_results) for a simulation where the results timestep multiplier has been set to 0, an error is raised (gauge_results - no such field). I should be able to access results for gauged object...
Oscar Holemans 26 days ago in InfoWorks ICM / API / Exchange 0 For Review

Ability to export gauge results to CSV

I would like the ability to export gauge results to CSV, in a similar way that I can export normal results using sim.results_csv_export or sim.results_csv_export_ex.
Oscar Holemans 22 days ago in InfoWorks ICM / API / Exchange 0 For Review

Fix sim.status method return values

As a user I want a reliable way to determine when a simulation has finished using the sim.status method. Currently, we have been advised to use sim.status == 'None' to determine when a sim has finished, which works (somewhat) for local sims but no...
Oscar Holemans 24 days ago in InfoWorks ICM / API / Exchange 0 For Review

Import data into 1D initial conditions object via the Exchange

I want to be able to add data to a 1D initial conditions object using the Exchange. This could be either from a CSV file using import_data or import_new_model_object, or through some other method. I can import data into a 1D initial conditions fro...
Oscar Holemans 24 days ago in InfoWorks ICM / API / Exchange 0 For Review

Enable Exchange Ruby method for carrying out spatial analysis in Workgroup Products

SQL tool in InfoAsset Manager enables users to perform spatial analysis of a variety of types using a selection of layer types. This is an extremely important and useful analytics tool which avoids the need for a user to export data out of InfoAss...
Anthony Andrews 6 months ago in InfoWorks ICM / API / Exchange 1 Gathering support

InfoAsset Online - Grid Sorting

When a selection of schedulable objects is made they are not ordered. They should be ordered preferably by the date completeled, with the latest survey at the very top of the grid.
Idris Nujjoo 10 months ago in Info360 Asset / General 3 Gathering support

Process statistical reports from Ruby and ICM Exchange.

As part of DWMP running TSR "en masse" may be a requirement.We would like to code these in and export the statistical report results onc ethey are complete.This would save a great deal of time and would be processed in the background.There will be...
Jose Pereira over 1 year ago in InfoWorks ICM / API / Exchange 1 Under consideration

“Snap Lateral Nodes to Pipes” function within the Ruby interface.

include the function for “Snap Lateral Nodes to Pipes” within the Ruby interface so scripts can be used to automatically fix connectivity issues within imported corporate datasets.
Richard Robinson 6 months ago in Other Product Ideas / Asset Management 0 For Review

Reminder and notification functionality to alert when follow up on specific reports is required.

Would it be possible to add in functionality so that users can set reminder dates against reports. This would be used to set alerts and flag to the user that further action is required on the designated date against that report.
Lianne Rose about 1 month ago in Other Product Ideas / Asset Management 0 For Review