Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 3 of 1370

Workflow that allows field inspectors to view CCTV recommendations directly in Info360 Asset and complete the CCTV directly in the product

After discussing with Martin and Martin about migrating workflows that are still occurring in Info360 Asset. After a Rehab Decision tree recommends that a pipe needs CCTV it would be useful to allow the field inspector to view the Rehab report wit...
Guest almost 3 years ago in Info360 Asset / Inspection & Media Management Workflows / User access / roles / permissions 3 Gathering support

Add the ability to drain subcatchments to the grate of a gully

When importing models from XPSWMM to ICM, my subcatchments drain directly to the node where an inlet capture curve is applied to limit flow to the 1d system. I would like to replicate this behavior easily in ICM when nodes are connected to the 2D ...
Sophia Buchanan almost 2 years ago in InfoWorks ICM / Inlets 0 Gathering support

Drain nodes connected to 2d domain representing road gullies to 1D pipe network without digitised connection

Often datasets of road gullies are only in point format and lack details on the connections to the surface water sewer network. A function to allow 1D nodes representing road gullies (which are are connected to the 2D domain with a head discharge ...
Guest over 1 year ago in InfoWorks ICM / Inlets 0 Gathering support