Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Validation

Showing 3

Add validation for errors causing simulation to fail

If a conduit has a cross section with zero width, the simulation will fail with the following message: "Fatal 37: INTEGRITY FAILURE: geo_setup - invalid conveyance for ABC474.1, section 1". The validation does not catch this error. It would be hel...
Corina Overman about 1 month ago in InfoWorks ICM / Validation 1 For Review

Addition of error message

When creating a mesh for the 2D zone of Clip meshing, if a single infiltration zone straddles multiple 2D zones, the meshing process succeeds, but an E2225 message occurs in validation. I understand that this message occurs because the infiltratio...
Nami Ikarashi 12 months ago in InfoWorks ICM / Validation 0 For Review

reduce validation time of models with infiltration zones

When using rainfall onto mesh in InfoWorks ICM, we often rely on infiltration zones to represent different land uses and their runoff characteristics (e.g., impermeable surfaces, grass, etc.). To ensure full coverage and avoid gaps or "donuts" in ...
Coen Maas 8 months ago in InfoWorks ICM / Validation 2 For Review