Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 103 of 1370

Make the Software more integrated with GIS

it will be much of help if the software supports TiFF or GeoTiFF files imports to allow usage of rasters for importing the soil types and land use. also importing tiff files can used to import surfaces from DEM weather open source or taken by LiDa...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Right-click and respecify connection origin

Currently, we can right-click and respecify connection (and bypass connection) destinations. We need the ability to respecify origins as well, to avoid having to redraw connections.
Daniel'le DeVoss 10 months ago in InfoDrainage / Hydrology 0 For Review

Add ability to use custom curve number tables other than the default TR-55

Many jurisdictions publish their own set of curve numbers for different land uses which they will expect to see during plan review. The local curve number sets often differ from TR-55. Please allow us to build custom curve number sets based on lan...
Guest 4 months ago in InfoDrainage / Hydrology 1 For Review

Importing PFDs as Images for P&ID visualization

A paramount feature of this tool lies in its capability to incorporate P&IDs or PFDs in PDF format. Presently, there exists a limitation wherein P&IDs or PFDs cannot be uploaded as PDFs. The ability to upload PDFs would be transformative, ...
Javier Coronado 10 months ago in Info360 Insight / Images 1 For Review

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Deterministic pump optimization +AI

physics based optimization of pumps coupled with ai tools that can support faster analytics
Guest about 2 years ago in Info360 Insight / Tools / Analytics 0 In progress

Histograms

The first step toward industrial optimization is establishing a baseline performance. In plants, histograms visualize historical performance statically. The shape of KPI histograms allows quickly establishing operation performance, i.e. high varia...
Javier Coronado 10 months ago in Info360 Insight / Data 0 For Review

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

Status Transfer for Critical Channels in Info360 Plant

To enable Info360 Plant to transfer a "status" for channels, allowing users to establish when a critical channel is missing data. Current Situation: Info360 Plant currently has value mapping capabilities, but there are limitations: Setting the val...
Javier Coronado 9 months ago in Info360 Insight / Admin / Global Changes 0 For Review