Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Other

Showing 7

A way to toggle pumps on or off with a counter.

Under the rule-based control add a way to toggle pumps on/off when tanks cycle. For example, define the counter variable as N=0 initially, then when a tank completes one drain cycle N=1, 2nd drain cycle N=2, and your pump control would look to the...
Guest 23 days ago in InfoWater Pro / Other 1 Gathering support

Option to relate split pipe ID to original ID

When splitting pipes, the new ID for the resulting pipe is based on the ID and Description tab in the model's Preferences. Instead of going with those settings, it would be nice to have an option to enable that would instead take the original ID a...
Kim Solberg over 1 year ago in InfoWater Pro / Other / Productivity 0 Gathering support

Delete Vertex in Pipe

I would like to be able to remove vertices from a pipe. Currently, you can only move the vertices or redraw the pipe. This process takes a while on big models and makes the distribution network more complicated.
Guest 9 months ago in InfoWater Pro / Other 0 Gathering support

Update Scenario Explorer terminology to match Run Manager

Modelers can use the "General" tab in the IWP Scenario Explorer to assign specific Report, Simulation and Time options to a scenario. To avoid confusion, the label shown in the Scenario Explorer should be changed to match the Run Manager.
Michael Kane over 1 year ago in InfoWater Pro / Other 0 Gathering support

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani almost 2 years ago in InfoWater Pro / Other 0 Gathering support

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support