Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 660 of 1370

Capability to View Manhole Panoramic Scans

Many of our client's manholes were surveyed with panoramic scans, so there are no still images that we can link to within InfoAsset Planner to view the inspection. We would like to ability to view manhole panoramic scans. The file format of these ...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

no flag update when updating via CSV

In ICM, when only updating a value via CSV file (Network -> Import -> Update from CSV files), the data flag should be left untouched instead of being "blanked" or updated with a new value (based on the "Flag to use for new/updated data" in t...
Guest almost 6 years ago in InfoWorks ICM / Flags / Import data 1 Gathering support

Intelligently select nodes in river reaches

When clicking on a node over a subcatchment, the software can recognise the user is after the node. When the same is done for a node on a river reach, the node is not automatically selected but rather the choice is presented to the user.
Guest almost 6 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

InfoAsset Planner - Allow Renaming of Data Miners

Allow Data Miners to be renamed in Data Miner.
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Multiple Conduit Selection

The Select downstream (or upstream) links button is of limited use. Typically, I would like to select all downstream CONDUITS, in order to create a long section, but I find ICM arbitrarily include overland links (curb & gutter) between nodes a...
Gregory Smith almost 4 years ago in InfoWorks ICM / Long Section / Profile / Productivity 0 Gathering support

InfoAsset Planner - Create Sub Groups in Operation Center

Allow Analyses, Toolbox Reports and Data Miners to be sub-grouped in Operation Center Tabs. This would help with keeping track of what goes where and simplify workflow when working on multiple, independent evaluations or evaluations with multiple,...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

As a company we wish to trace live / assets. our Networks include abandoned assets resulting in incorrect traces urrent traces h

option switch to exclude closed / abandoned assets from searches. searches being undertaken in InfoAssetOnline currently identifing incorrect list of u/s or d/s assets viewed.
Richard Robinson almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Export results to CSV/Database with a more flexible selection list in ICMLive

In ICMLive, we can now export results to CSV/Database with a pre-defined selection list. In ICM, we can have a more flexible way. For example if I hope to export results point (2D), initially I may have 1 million points. What we can do in ICM is, ...
Guest about 6 years ago in InfoWorks ICM / Live Modeling 0 Gathering support

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists

Calculatiton speed with diffusion needs to improve.

Diffusion will seriously slow down the model culculation. But generally the water quality models have to run for several years. With current simulation speed that would be unlikely to do a water quality simulation with diffusion.
Liu Qiusheng about 6 years ago in InfoWorks ICM / Info360 Cloud  / Pollutants / Water Quality 0 Gathering support