Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 347 of 1370

Dark theme for InfoWorks

I prefer working from a dark theme to reduce eye strain while working in models multiple hours day.
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Other 0 Gathering support

Assign A Unique Color for Each Catchment

it would be helpful if we could assign a unique color for each catchment instead of one color for all catchments with that I can assign for example brown for the catchments with the percentage impervious 100% and green for those with the percentag...
Guest about 2 years ago in InfoDrainage / Visualization 1 Gathering support

Comparing the inputs of two runs

When I have two runs, I can compare the results of both of them. But for some cased I would need to compare the parameters or simulation options. This would be similar to comparing two versions of network database but its focusing globally on the ...
Guest about 1 month ago in InfoWorks WS Pro / Productivity 2 Gathering support

Data Exchange for Revit

It would be useful to provide a seamless data exchange with other Autodesk products rather than just C3D - specifically Revit. On an architectural scale project, we often dont use a package like Civil 3D so being able to carry out drainage design ...
matthew.piggott 4 months ago in InfoDrainage / Data Exchange 0 For Review

Video generation of InfoDrainage simulations

Requesting the ability for InfoDrainage to export simulations to .mp4 or .avi files for distribution and review. Right now, you can play the simulation in InfoDrainage, but need a screen capture software to record the results into the video for ex...
Tim Medearis 7 months ago in InfoDrainage / Reporting 1 For Review

Ability to look at multiple phases (surface and foul networks together) in 3D

Being able to view both surface and foul networks within MicroDrainage was always a very useful feature to visualise crossing points in the network and it doesn't look to have been included in InfoDrainage.
Henry Wilkinson 7 months ago in InfoDrainage / Productivity 1 For Review

Results tables to be ordered from most upstream junction/connection to outfall

As per the title, currently the results tables are presented in numerical order - which doesn't always make sense when interpreting the results. I.e should be presented in the same order they were in Microdrainage.
Guest about 1 year ago in InfoDrainage / Reporting 0 For Review

Order Junction & Connection Results Printout by Flowpath (to match the Model Printout)

Issue: When using the 'print' feature, if a flow path is selected, the model summary for junctions will show ALL connected pipes, in 'flow' order, which is very useful for presenting/understanding data. However, in the results tab for connections,...
Alex Purcell over 1 year ago in InfoDrainage / Reporting 0 For Review

Moving multiple nodes and links simultaneously

The “Move Nodes” option under GeoPlan > Geo Plan tools does not seem to allow for the moving of multiple nodes simultaneously. Additionally, having an option to move selected objects in one go would be very helpful, allowing a user to move grou...
Guest 8 months ago in InfoWorks WS Pro / Productivity 1 Gathering support

Save phase results seperately

When working with multiple phases I would like to be able to run one phase (exclude all others from analysis) and have the results saved. Results should only be overwritten when a new run on the same phase is completed.
Andrew Komarnycky 11 months ago in InfoDrainage / Productivity 0 For Review