Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 380 of 1442

"Copy to clipboard" alongside print/export on Microdrainage spreadhseet input/outputs

Would greatly simplify the process of getting results/details from MD into a report, skipping a stage in the current process (Export to CSV/Excel - Open)
Guest over 3 years ago in InfoDrainage 0 Gathering support

to be able to change the default button in storm duration

to be able to change the default button in storm duration so I can set up my own default settings
Guest over 3 years ago in InfoDrainage 1 Gathering support

Please can the output drawings be able to be produced in landscape.

When using the extend view to produce drawings it appears to be only able to undertake in portrait. Also the title block cannot be changed in size which can make the drawings untidy. Finally can there be an option to move the lables around so they...
Guest over 3 years ago in InfoDrainage 1 Gathering support

Infiltration Basins

The output tables for ponds doesn't include any infiltration outputs where the pond is an infiltration basin. The graphs show that there is infiltration but MicroDrainage used to include infiltration in the output table
Guest over 3 years ago in InfoDrainage 2 Under consideration

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam almost 2 years ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub almost 2 years ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott almost 2 years ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing almost 2 years ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest over 5 years ago in InfoWorks WS Pro / Other 0 Gathering support