Ideas

Showing 349 of 1372

A simple way to straighten short links to display symbols more clearly

When using the "Expand Short Links" option I find that the expanded links will inherit some geometric points from the adjacent links, and hence symbols for valves, meters etc may not display too well if adjacent to a pipe bend. It would be useful ...
Owen Lewis over 5 years ago in InfoWorks WS Pro / Other 1 Gathering support

I want to be able to see what connected Agents are doing and trouble shoot connections from within WS Pro

A command centre program for WS Pro/IWLive runs which shows connected agents and marshallers and all the runs in a simulation workgroup in one place. Better simulation workgroup diagnostics. I am trying to trouble shoot remote VPN issues and the ...
Ann Pugh over 5 years ago in InfoWorks WS Pro 0 Will not implement

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Print Tickbox for Manhole Schedule Layout option

In MicroDrainage 2019.1 the Manhole Schedule printout also includes a manhole layout, sometimes this is unnecessary and it would be helpful if there was an additional tickbox option in the printout settings.
Guest about 3 years ago in InfoDrainage 0 Gathering support