Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

InfoWorks ICM

GPU for 2D Erosion Deposition Model

The 2D erosion-deposition model can only be simulated on the CPU. For 2D rain-on-mesh models with GPU simulation times spanning hours, it becomes impractical to integrate the 2D erosion-deposition model, as CPU simulation times would extend into d...
Daniel Fensom almost 3 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Provide min_time_step on 2D results mesh

In an effort to speed simulations up - it would be helpful to know what mesh elements are slowing down a 2D simulation. A single Job Progress value is insufficient to chase down which of these 200K mesh elements is slowing down the model.
Guest almost 3 years ago in InfoWorks ICM / Results 1 Gathering support

Transportabele database (.icmt) containing an earlier version of the commited network without losing the commit history

For the moment we can only 'branch' an earlier version from the commit history interface or 'copy' this earlier version. - the branch can't be disconnected from the 'mother' network - the copy looses the commit history It would be nice to deliver ...
Pieter Snoeck about 5 years ago in InfoWorks ICM / Data Exchange / Export Data / Transportables 0 Gathering support

i am looking to bring google map in background

No description provided
Guest about 5 years ago in InfoWorks ICM / GIS Layers / Productivity 2 Gathering support

Add section results to profile view

I would like to view the water level (or velocity, froude number etc...) at each cross section when displaying a river reach long profile.
Raphael BAUBION about 1 year ago in InfoWorks ICM / Long Section / Profile 1 For Review

Ability to snap to DWG or GIS background layers

When moving a manhole, I would like to snap to drawing geometry
Guest about 4 years ago in InfoWorks ICM / Productivity / Visualization 0 Gathering support

Allow Simulation Time and Reporting Time to set independently

Similar to the functionality available InfoWSWMM where you are able to define a start date and time for the simulation and a start date and time for results. This allows initial phases of the model simulation to be ignored by the results without n...
Guest over 2 years ago in InfoWorks ICM / Simulations 2 Gathering support

Units for catchment area: add km²

The choice of display units of the catchment area (under Tools--> Options--> Units) is now limited to ha or acre, which is not convenient for our river subcatchments. It would be useful to add the possibility of km².
Michael Huybrighs almost 3 years ago in InfoWorks ICM / Other 0 Gathering support

Update French rainfall to include multiple durations

Ability to add more than 1 duration per return period in a single rainfall object. There are 3 sets of parameters for durations 6 < t < 60, 60 < t < 360 and 360 < t < 24hr. It would be useful to be able to add these parameter...
Guest over 3 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Sediment depth variable for Storage nodes

It appears that amounts of sediment are carried along when water is overflowing over the banks of the river: part of the sediment from sediment fractions SF1 and SF2 leaves the river and goes to the Storage Areas during flooding. Although this is ...
Edith Maroy over 3 years ago in InfoWorks ICM / Sediment / Simulations 0 Gathering support