Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 231 of 1370

Import Inspection Data with .accdb Databases

It appears that InfoAsset Planner can only import inspection databases with a .mdb extension. Since the .accdb extension is the newer Microsoft Access format (since around 2003), can InfoAsset Planner include the capability to read .accdb inspecti...
Guest almost 5 years ago in Other Product Ideas / Asset Management 1 For Review

As a user, I want to be able to add fields to an analysis report and have the wizard automatically populate the new field when run

For example, one of the reports available for the Survey Data Analysis Wizard is for PACP scores. I want to add a field for the total number of defects associated with each segment and have it automatically populated when I run the CCTV Survey Ana...
Guest almost 5 years ago in Other Product Ideas / Asset Management 0 For Review

Display Warnings when Tank Stage/Volume Curve Inconsistent with Levels

As far as I can tell this is an EPANET bug, but say your tank levels are set to minimum 4 and maximum 20. If you have a stage/volume curve that goes below 4, your tank will supply water forever from a level of 4 feet.
Guest almost 5 years ago in InfoWater Pro 1 Already exists

A Slack or Discord server for Innovyze users to use a knowledge sharing platform

As a User and Manager of a team that depends heavily on Innovyze products, either Slack or Discord server, and StackExchange (ideally both) set up by Innovyze to facilitate cooperation and knowledge sharing with other Innovyze users would greatly ...
Guest almost 5 years ago in Other Product Ideas / Other 3 For Review

Bring back the pause button for calculation.

In one of the first version of Infoworks there was a pause button for calculation. We have some big calculations who mostly run at nighttime. Sometimes the run is so big it still runs in the morning. The only thing we can do is stop the calculatio...
Erik Amting almost 5 years ago in InfoWater Pro 0 Will not implement

I want to be able to customize the minor loss table for pipe networks.

It would be nice if the user could modify the minor loss table for pipes. Whether it be changing the minor loss values, deleting, or editing the existing values. Since we all have our own resource we typical reference for these values, it would be...
Guest almost 5 years ago in InfoWater Pro 1 Gathering support

As a user, I would like the computing time to be reported as clock time rather than CPU time in XPSWMM 2D

I just noticed this when trying to run a test on model speed. This is with the “CPU” Extreme option and 4 CPUs selected. The clock time is about 16 minutes, but the elapsed time is showing at 58 (close to 16x4). I think the ET is counting CPU time...
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

CAM Enhancement

CAM Enhancements A few things to consider that I think would make your tool better than others I have seen/used: 1. The ability to export the pounded areas into GIS. It seems to me this shouldn’t be difficult as you are color coding them now in ...
Guest about 5 years ago in InfoWater Pro / Engine 0 Under consideration

Customize pipe ID field in UDF field journal

Currently the model ID's are populated in the "Pipes to Flush" box of the UDF field journal. We store our GIS Asset ID in an information field. We want to use this field as the basis of communication with field teams.
Guest about 5 years ago in InfoWater Pro / Operational Modeling 0 Gathering support

As an organisation we want InfoAsset Manager to be able to show dimensions relative to fixed points

In plans underground assets are often positioned using dimensions relative to a fixed point (pe corner of a house). InfoAsset Manager should be able to create dimensions like that.
Bram Calle about 5 years ago in Other Product Ideas / Asset Management 0 For Review