Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 320 of 1373

Allow entry of night use value for ILI calculation

InfoWorks WS Pro uses a night use value litres/connection/hour for demand area calculation. It would be nice if we could enter this value into Insight instead of a volume.
Brad Thompson over 2 years ago in Info360 Insight / Tools / Analytics 0 In progress

Identify Component within Workspace Component Configuration

After a component (e.g. Historical Chart, Comparison Chart, Pump Status Chart) has been added to a Workspace, a user cannot identify what component-type it is. It would be helpful when a user/admin has the option to Configure the component, the na...
Amelia over 2 years ago in Info360 Insight / Workspaces 1 Already exists

Variable baseflow

(Could also be considered hydraulics) On large scale projects where we may have limited information and funding, we assume baseflow values through an upstream point inflow. It would be beneficial to have a variable baseflow input per design storm....
Jess Ewing almost 2 years ago in InfoDrainage / Hydrology 1 Gathering support

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 1 year ago in InfoDrainage / Productivity 1 Gathering support

Schematic for Dry Wells

When adding a dry well, it would be useful to provide some labelled images like those available for other stormwater controls to clarify what the properties are refering to.
Midori Patterson almost 2 years ago in InfoDrainage / Visualization 1 Gathering support

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Adding a "Default" selection box when Outputting information

To ensure the information output is not too much or too little, it would be good to have a default set of information that can assist LLFAs in reviewing print outs. This came up during a webinar I attended about auditing models. Sometimes you can ...
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

Better Asset Management

Asset management is crucial in a treatment plant for several reasons: Optimal Performance: Regular monitoring and maintenance of assets ensure that they are functioning at their best. This leads to efficient water treatment processes and high-qual...
Guest almost 2 years ago in Info360 Insight / Asset 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review