Skip to Main Content
Autodesk
ADD A NEW IDEA

InfoWorks ICM

Showing 498 of 1170

Possibility to get the results from all timesteps for every section of a river reach by Ruby scripting

Now there are only two options: get the results for all timesteps for the first section of the reach (results-method), or get the results at all sections, but only for the current timestep (result-method). I would like to be able to query the resu...
Michael Huybrighs about 1 year ago in InfoWorks ICM / Results 0 Gathering support

Consolidate Mesh Report in Product

While the meshing report for clip meshing has improved, it still provides a lot of debugging information mixed with creation data, and limited summary of the mesh. Please consider the following to facilitate model reviews. Summary Section (current...
Matt Anderson about 1 year ago in InfoWorks ICM / Mesh 1 Gathering support

Update French rainfall to include multiple durations

Ability to add more than 1 duration per return period in a single rainfall object. There are 3 sets of parameters for durations 6 < t < 60, 60 < t < 360 and 360 < t < 24hr. It would be useful to be able to add these parameter...
Guest almost 2 years ago in InfoWorks ICM / Rainfall 1 Gathering support

Sediment depth variable for Storage nodes

It appears that amounts of sediment are carried along when water is overflowing over the banks of the river: part of the sediment from sediment fractions SF1 and SF2 leaves the river and goes to the Storage Areas during flooding. Although this is ...
Guest almost 2 years ago in InfoWorks ICM / Sediment / Simulations 0 Gathering support

Order ARR19 Box and Whisker plots by duration

The box and whisker plot outputs order alphabetically. It would be useful if it ordered based on rainfall event duration instead.
Guest almost 2 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

closed pipe

One of the nice features of WSPro is the ability to simply close a pipe. This would come in very handy in ICM as well, as this would allow for some very cool what if analyses and makes it possible to keep a pipe in the network (for visualization) ...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / InfoWorks 2 Gathering support

Inlet pump

We are mode and more incorporating surface water systems in our ICM models and part of those systems are inlet pumps that respond to the downstream levels instead of the upstream levels. Up until now, the only way to achieve this is by creating an...
Marcel Glasbergen over 1 year ago in InfoWorks ICM / Pumps / RTC 0 Gathering support

Document that the pump with depth curve is not correctly converted.

Document that the pump with depth curve is not correctly converted.
John Krpan 7 months ago in InfoWorks ICM / Errors 2 For Review

Control units precision in long plots and grid plots

it would be nice to be able to control unit precision such as volume in m3 to a whole number when reported volume is in the 400000 m3. we do not need to see 4 digits past the decimal!!
John Krpan 7 months ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

Time varying roughness values for rivers

As vegetation changes throughout the seasons, it would be great if we could also have time varying roughness patterns for river reaches.
Guest almost 5 years ago in InfoWorks ICM / Hydraulics / River Modeling 0 Gathering support