Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 868 of 1442

Templates for GMR Config Objects

We have a large team of modelers that manage many different GMR runs. It's important to keep the Output and Analysis options matching between these runs.We want to manage a central template to define and control consistent options between many GMR...
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Productivity 0 Gathering support

Statistic Report Batch Processing

As a user the ability to 'schedule' statistical reports would be extremely useful. currently if i'm generating a spill report on several overflows for a 10yr TSR series this can take several hours. The process effectively locks the software and pr...
Jason Drake almost 6 years ago in InfoWorks ICM / Productivity / Results 4 Gathering support

Add simple percentage difference in calibration graphs

Add a simple percent error field between Overserved vs Model results (for min/max depth, flow, volume and velocity) in calibration graphs. Calibration targets are often presented as +- x%. Including a percent error field will make it much easier w...
Guest over 2 years ago in InfoWorks ICM / Calibration 0 Gathering support

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

'Find and Replace Flags' tool on multiple networks.

As a large organisation with multiple users of InfoWorks ICM we have a set up with one masterdatabase and everyone using groups off this in order to keep all users on the same version. The downside is, that as users import previous models more fla...
Tom Walker almost 6 years ago in InfoWorks ICM / Productivity 0 Gathering support

Ability to update and/or overwrite a spatial layer

Currently the user needs to delete the layer and re-import a new one. There should be an 'update' uption for all spatial layers.
Martha Nunez over 2 years ago in Info360 Asset / Asset / Spatial Data Import 1 Under consideration

Generate new synthetic rainfall events using ICM exchange

No description provided
Guest almost 6 years ago in InfoWorks ICM / API / Exchange / Rainfall 0 Gathering support

More tools for geometry manipulation

When building networks with multiple similar sections, it would be incredibly useful to have more tools for manipulating the geometry of selected objects, primarily a rotation tool and an invert/flip tool (e.g. swap the orientation of the nodes ei...
Guest 8 months ago in InfoWorks ICM / InfoWorks 1 Gathering support

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Provide a Data Quality Dashboard during the import process

After importing asset data it would be useful to have summary statistic on what the data looks like and any data gaps that may impact results of a model. This information would be useful: Import data page with quality scoring missing field ana...
Martha Nunez 3 months ago in Info360 Asset 0 Under consideration