Showing 232 of 1372

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest about 6 years ago in Other Product Ideas / Asset Management 1 For Review

Be able to drag the grid window off main interface to another monitor.

Drag grid window to another screen, just like an attribute table in ArcMap/ArcGIS Pro. Allowing more relaxed and open use of grids, with much less scrolling through tight windows.
Guest almost 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists