Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 235 of 1442

Report volume stored in all tanks

I can calculate volume from level, but it's an extra step and requires that I copy the run results out to Excel. It's even more difficult if I have a non-circular tank. Please include tank volume in the tank results and in the "System Demand" report.
Colin Ricks over 5 years ago in InfoWater Pro / Productivity 1 Gathering support

Adjust VSP "Control Value" during model run with Basic Controls

Seems like a fundamental control to be able to adjust a pump's target flow rate dynamically, for a high/low flow setpoint based on tank levels or other triggers. I can currently adjust the speed setting in basic rules, but trying to hit a target f...
Eric King almost 3 years ago in InfoWater Pro / Operational Modeling 2 Gathering support

Indivisual bookmarks from selection

When creating large volumes of spatial bookmarks, it would be useful if you could select all features and it create individual bookmarks for the selection, rather than the current 'add from selection' option which only creates one bookmark for the...
Lee Forth over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Limit InfoWater Pro Results Output for External Applications to Certain Runs

Currently, when using the "EXT_APP_FILTER" setting to output results in .dbf format for selected elements, .dbf files are created for every single scenario that is run, although the .dbf output files might not be needed for all scenarios. This unn...
Christene Razafimaharo almost 3 years ago in InfoWater Pro / Productivity 0 Gathering support

Zoom to domain when inactive facilities selected

When inactive facilities are included in the domain, clicking the "Zoom domain" button only zooms to the extent of the active facilities in the domain. If only inactive facilities are part of the domain (no active facilities at all), then this but...
Colin Ricks almost 3 years ago in InfoWater Pro / Productivity 0 Gathering support

Capability to View Manhole Panoramic Scans

Many of our client's manholes were surveyed with panoramic scans, so there are no still images that we can link to within InfoAsset Planner to view the inspection. We would like to ability to view manhole panoramic scans. The file format of these ...
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks over 6 years ago in InfoWater Pro / Other 3 Under consideration

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest almost 5 years ago in Other Product Ideas / Asset Management 1 For Review

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood over 6 years ago in Other Product Ideas / Asset Management 0 For Review