Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 126

Energy Toolsets

A tool to help in energy audits to help determine energy usage of a particular asset. Often data consumption is not always recorded, but other variables that can be used to inferr energy are (flow and pressure). We should be able to back calculate...
Guest over 2 years ago in Info360 Insight / Tools / Analytics 0 Under consideration

Simple Criticality Assessment Manager reporting in InfoWater Pro

I want a simple report for each pounded area between valves, reporting the length of pipe affected, number of customers, number of critical customers, amount of demand taken offline by isolation, and possibly the total volume of demand lost betwee...
Guest about 5 years ago in InfoWater Pro 0 Under consideration

Incorporate Scenario Manager and Data Sets

IAP is very good at calculating the risk profile under existing conditions, and recommending rehabilitation actions. It would very powerful to combine these tools with the scenario manager and data set functionality that exists in the Innovyze hyd...
Guest over 5 years ago in Other Product Ideas / Asset Management 1 Under consideration

Add multiple rows to the InfoWater "Rule Header" DB table

In the "Pipe Control" or "Node Control" DB tables, I can insert or append multiple rows at once. In the "Rule Header" DB table, I can only insert or append one row at a time, and each row must have an ID. Please make the behavior of this table co...
Colin Ricks almost 3 years ago in InfoWater Pro 0 Under consideration

Split pipes using the InfoWater "Digitize Network" tool

The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split whe...
Colin Ricks almost 6 years ago in InfoWater Pro 1 Under consideration

Include the San Diego Modified Rational Method

Include the San Diego Modified Rational Method as a routing option in the simulation parameters, similar to how its been incorporated to InfoSewer and InfoSWMM
Guest about 3 years ago in InfoDrainage 1 Under consideration

InfoDrainage - Split Catchments option for Laurenson Runoff Routing Method

It is industry best practice to split up the subcatchments in a model into their pervious and impervious areas when adopting the Laurenson (or RAFTS) runoff routing method ie U = 2 and U = 0. The current workflow to achieve this is to setup the mo...
Guest about 3 years ago in InfoDrainage 1 Under consideration

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

Build Custom Analytic from Map

It'd be very helpful if the custom analytic tool have a map selection option. I'd like to fill in my equation by simply selecting the sensors on the map. Right now I'm building a custom analytic by having 2 tabs open: one of my map and one of the ...
Tim Medearis almost 4 years ago in Info360 Insight 0 Under consideration

View charts in place of the tables

View a chart instead of a table on the front web pages for each component such as Dashboard. Charts look spectacular.
Guest over 4 years ago in Info360 Insight 0 Under consideration