Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 202 of 1372

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani almost 2 years ago in InfoWater Pro / Other 0 Gathering support

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 11 months ago in InfoWater Pro / Other 0 For Review

I&I BizBlock for Wastewater Collection and Transmission

To be able to use SCADA/RTU volume readings from either gravity area/velocity meters or Lift Stations (with diameter and float level readings) to calculate volume. Then there a few statistical steps to sperate Inflow from Infiltration. Additionall...
Guest over 4 years ago in Info360 Insight 0 Gathering support

Hydrant Design Flow vs Available Flow!

I don't like the new update, which makes the available flow subject to a velocity constraint. In the previous version, the pressure constraint was on the hydrant flowing, while the design flow would consider the network pressure and pipes. They sh...
Guest 11 months ago in InfoWater Pro / Engine 0 For Review

Data Inference Engine - ideally built on ML

As a user I want a tool that will flag and replace periods of bad data with "inferred" data applied through models/ML/ARIMA.We can only derive insights if we have good data and that is the concern of every utility. Data quality especially becomes ...
Nathan Gerdts almost 5 years ago in Info360 Insight 1 Under consideration

Persistent Graphs in InfoWater/InfoWater Pro

Stored graphs aren't that great. Why not just make graphs persistent?
Guest almost 5 years ago in InfoWater Pro / Productivity 2 Under consideration

GIS and Reporting Capabilities

I just had a meeting with Orange County, FL. They just want a tool that can do really good reporting. See example attached where you need GIS info, GIS map, SCADA data summarization and Info collected from a work order in a CMMS (Maximo in this ca...
Guest almost 5 years ago in Info360 Insight 1 Under consideration

Data Sets

It would be very helpful if, for any data set that is created by creating a clone of another data set, you could keep track of that. Perhaps a visually branched system of data sets to see if any of the sets were created based on another set. That ...
Guest almost 5 years ago in InfoWater Pro 1 Under consideration

Horizontal surge tank equivalent diameter

I also am still assuming that if I want to model a horizontal tank, you must put in an equivalent diameter not the actual diameter.
Guest about 2 years ago in InfoWater Pro / Productivity 0 Gathering support

Allow to use analytics as the main KPI in the KPI component in workspaces.

Currently the KPI component in workspaces only allows to use physical sensors and excludes analytics. Analytics can only be used as comparison point. UU has created an analytic which they wish use as the main KPI in this workspace component.
Guest about 1 year ago in Info360 Insight / Workspaces 0 In progress