Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

ICM - Statistics Template: Daily events

I want to be able to break my events into daily values. Currently this would require setting up 7 separate templates each with the unique day set under the 'Time Window' button. I want a tick option added that will allow me to do this within the s...
Guest about 5 years ago in InfoWorks ICM / Reporting / Results 1 Gathering support

As a user i want to see 'failed' simulations within the Results Management Window rather than 'completed' status

When a sim completes as status Incomplete the sim icon changes to red and the Job control window states sim status Incomplete. However, in the Results Management window the sim status is ‘Complete’! For consistency and user friendliness; Please ...
Guest almost 4 years ago in InfoWorks ICM / Reporting 0 Gathering support

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest over 6 years ago in InfoWorks WS Pro 0 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest over 2 years ago in InfoDrainage / Hydraulics 1 Already exists

Ability to add 'direction' symbology to the pipes in a network.

This is useful so clients can identify and correct pipes with wrong direction in the GIS
Guest almost 4 years ago in Info360 Asset / Customization / Styling / Layer Panel 1 Gathering support

Pop Up Screen customization

Please add functionality to edit what information is shown in the popup Window when I go over a pipe. The information that is shown provides no value and I should be able to select what is shown in my pop up windows.
Guest over 1 year ago in Info360 Asset / Data Editing / Map visualization 2 Gathering support

Include groundlevel as attribute in export network 2D mesh elements

When you export a model to shape for example, only the element id is included. You have to run a simulation (for a second) and then exporting maximum reveales the element ground level. It saves time to add the mesh element level to the export. Alt...
Jan Meulen over 6 years ago in InfoWorks ICM / Export Data / Terrain 0 Gathering support

Innovyze License Administrator

New license administrator is terrible compared to the previous one.
Michael Wetterau almost 4 years ago in Other Product Ideas / Licensing 1 Will not implement

Microdrainge to Revit

Make Pipes and Inlet available in Revit
Guest almost 4 years ago in InfoDrainage 0 Gathering support

Switch design return periods when running cascade analysis

I would like to be able to build a single cascade model & able run it for various design return periods instead of needing to create separate cascade models for each return period.
Guest almost 4 years ago in InfoDrainage 1 Already exists