Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1374 of 1374

Life Cycle Cost Analysis & Advanced Financials

No description provided
Mike Maylone almost 3 years ago in Info360 Asset 1 Gathering support

Batch CCTV Video and Photo Import for Info360 Asset

I have been working in the Corte Madera project and have ran into a couple of challenges that although not stop blockers, they are very time and resource consuming tasks. Downloading data provided by client: If a client provides 200GB of data, it ...
Martha Nunez over 4 years ago in Info360 Asset / Import / Upload 0 Already exists

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Field for CCTV scoring standard used

Need a field to display the standard used to score the approved survey. It should say 'NASSCO PACP v6' or 'MSCC' and all the other defect standards. Right now there is no field so you can't tell whether a pipe inspection was scored using PACP v6 o...
Tim Medearis over 4 years ago in Info360 Asset / CCTV Standards (e.g. PACP) 1 Gathering support

Use edit flag for selection of fields only

By using the Use edit flag option, all changed fields are now set to the edit flag. For a lot of fields (for example the us and ds node or the suffix) it is not necessary to set this flag to the Edit flag.
Guest almost 6 years ago in InfoWorks ICM / Flags 0 Gathering support

Add filters to inspection charts

The charts tool, when viewing PACP inspections, currently shows the distribution of scores only. For reporting purposes, it would be nice if some additional parameters could be added. For example, seeing the score distribution across pipe or inspe...
Kim Solberg over 1 year ago in Info360 Asset / Map visualization 1 Gathering support

Reference risk and rehab results in risk model

Proposing increasing risk component types to include results from other risk models and rehab plans. Ideally, it would function similarly to the Pipe Inventory option within IAP that would allow you to select any table within the project database....
Kim Solberg over 1 year ago in Info360 Asset / COF & LOF Categories / Components 1 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Improvement on the Numerical Correction Process in ICM

The current procedure for ‘Numerical Correction’ in ICM requires users to remove any existing values to calculate the correction (for Preismann and Base flow) before the inbuilt routine is run. If this wasn't made the calculated correction values ...
Guest almost 6 years ago in InfoWorks ICM / Hydraulics 1 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support