Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 239 of 1374

InfoDrainage - Time of entry to be called time of entry, not time of concentration

Te has specific meaning in the UK when using the rational method (modified). Tc also has speific meaning (Te + sumTf). It would be better if the software wants the user to input a Te, that it calls it Te. At the moment it calls the Te Time of conc...
Guest about 3 years ago in InfoDrainage 0 Gathering support

InfoDrainage - replace stormwater outline with DXF (or other similar file)

Would be useful to be able to 'replace outline' of a stormwater control by importing a polygon (e.g. DXF, SHP etc), rather than the existing options which are just to redraw in ID only. Every project there seems to be need to replace an outline fr...
Guest about 3 years ago in InfoDrainage 1 Already exists

Improved tutorial for setting up a network

InfoDrainage - i am just trailing software and using the metric tutorial. i do not like loading in items from MicroDrainage or AutoCAD and was hoping the tutorial would show how to quickly setup a highway drainage system with pipes/manholes/gullie...
Guest about 3 years ago in InfoDrainage 1 Under consideration

Enhance InfoDrainage Long Sections

No description provided
Guest about 3 years ago in InfoDrainage 1 In progress

Sewer Design - Locking gradients

It would be useful if you could lock sewer gradients or manhole relationships so that if you changed an upstream level it would automatically amend downstream levels
Guest about 3 years ago in InfoDrainage 1 Gathering support

Apply direct inflows to permeable paving

There should be a way of applying the inflow that the paving receives directly (i.e. the rain that falls onto it) to produce a more accurate simulation of the rainfall. This direct rainfall isn't a lateral or point inflow, and being forced to mode...
Craig Bobbett 10 months ago in InfoDrainage / Hydraulics 0 For Review

asd<h1>bugBounty</h1>

asdasdsad
bugBounty BugBounty 10 months ago in Other Product Ideas / Other 2 For Review

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

InfoAsset Mobile Report Colour Categorization of the Report Tab

Similiar to the ability to categorize emails in Outlook allow users to categorize further the reports that are assigned to them. Either by colour coding or putting into categories aside from those headers in the Report tab
Lianne Rose 11 months ago in Other Product Ideas / Other 0 For Review