Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 120 of 1370

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest about 5 years ago in InfoWorks WS Pro / Other 0 Gathering support

Demand Diagram Timestep from Demand Area Calculation Page

When producing a Demand Diagram from the Demand Area Calculation Page, it would be useful to be able to choose the Demand Diagram Timestep (of course it can be les than the minimum Live Data timestep).
Paolo Boiardi almost 2 years ago in InfoWorks WS Pro / Other 0 For Review

Option of splitting pipes/Polygons in InfoWorks WS Pro

Like the option available to split the polygons, if there is an option available that would be good. If we are able to automatically split the pipe into many segments automatically using an automated option like the feature available in ICM to ge...
Guest over 5 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Enable re-runs for selected scenarios

With the new Reserved Run workflow I can re-run simulations with my latest changes quickly without needing to commit. However if I'm using scenarios in the run, WS Pro re-runs all scenarios every time, even if there weren't any changes. I want an ...
Nathan Gerdts about 2 years ago in InfoWorks WS Pro / Productivity 0 Gathering support

Making a run in WS/WSpro now a (big) list of yellow warnings pop up. By using an optional selection of (run)validation items not anymore

Making a run in WS/WSpro the input always gets fully validated including items not used. Those items creates a (big) list (e.g. 81.273) of yellow warnings. Besides run/validation time causes this a list of not wanted necessary warnings which makes...
Jeroen Fietje over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support