Showing 343 of 1370

Sewer Design - Area Density Method

Area Density method is recommended to be incorporated in Infodrainage as it offers improved accuracy and aligns with Indian flow calculation standards which could enhance the reliability of the outputs. This method is described in Indian Guideline...
matthew.piggott 7 months ago in InfoDrainage / Other 1 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest 10 months ago in InfoDrainage / Data Exchange 0 For Review

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest 10 months ago in InfoDrainage / 2D Flooding 2 Already exists

Tree Pits

Add Tree Pits as a type of SuDS structure.
Guest about 3 years ago in InfoDrainage 2 Under consideration

Allow no delay connections with a free flow outlet option instead of automatic orifice nodes.

Currently when flows from a pipe with a free outlet node is diverted to a different location via a no delay connection, the free flow outlet automatically changes into an orifice, which in fact does not exits there. This orifice also needs a manua...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Bioretention Underdrain Slope / Additional layer Options

Virginia specifications for a bioretention requires the underdrain to have a slope to it, but Infodrainage slope does not allow for this in the SWC bioretention SWC. Also, we sometimes have to place the underdrains in a trench below the storage la...
Jenna Woyner almost 2 years ago in InfoDrainage / Hydrology 2 Already exists

Run same return period with multiple climate change allowances

When running the simulation wizard I would like to be able to run the same return period with multiple climate change allowances to enable a single analysis covering all scenarios. This will avoid needing to adjust inputs & rerunning the netwo...
Guest about 3 years ago in InfoDrainage 1 Already exists

Modelling intermediate check dams and weirs in open channels including ponds ands swales

Currently, InfoDrainage only allows modeling of check dams or weirs at outlets. For open channels with multiple intermediate check dams, users must split the channel into sections, each with its own outfall defined. A more accurate feature allowin...
Dilraj KT over 2 years ago in InfoDrainage / Hydraulics 1 Gathering support

Show catchment areas of non-current phases

It is useful to be able to see the catchment areas of non-current phases if they have visibility switched on. For example, to make sure that a whole site with multiple outfalls has the total catchment digitised with no gaps.
Matthew Johnson about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review