Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 123 of 1370

Better Video Encoders

The AVI recorder uses a Windows 11 unknown CODEC - update the video encoder to something modern!
Guest over 1 year ago in InfoWorks ICM / Performance 1 Under consideration

Improve "update from live data" performance

big models with many live data points connected to control takes a long time to update.
Pieter Piens over 3 years ago in InfoWorks WS Pro 0 Gathering support

Optimize PRV Settings, including flow modulated PRVs

I want a tool that can help define the minimum pressure setting at a PRV to provide required pressure to downstream customers under expected demands. In addition, in cases where I have flow modulated PRV's, I want the tool to provide a curve of pr...
Guest about 4 years ago in InfoWorks WS Pro / Automation 0 Gathering support

As a planner, I want a single, integrated modelling platform to represent the water supply, sewerage and drainage (1D/2D) system.

Melbourne Water has successfully completed a pilot modelling study using InfoWorks ICM to build a single integrated model to represent the water supply, sewerage and drainage system (including overland flooding) for a proposed redevelopment area (...
Andy Chan about 6 years ago in InfoWorks WS Pro / Data Exchange 0 Gathering support

Speed up interfaces with 2D zones with millions of elements (make it a multicore process)

The interface for large 1D-2D models is very slow. While moving through the geoplan every time it takes about ten seconds to load and show the location. We noticed that in this time only 1 of the 32 CPU is used for 100%. We tried 2 complete differ...
Guest over 5 years ago in InfoWorks ICM / Performance 1 Gathering support

roll back commit history

We can see what the commit history is, but if you made a mistake and committed it there's no way to go back without making a new branch. Would be good to be able to roll back changes to a selected point in the commit history so your mistake isn't...
Ben Davies over 3 years ago in InfoWorks WS Pro 1 Gathering support

Available flow capacity analysis with relative pressure drop tolerance

We want to evaluate how much additional demand flow can be pulled from each node independently, while ensuring that no node or customer in the system drops by more than 1 meter of minimum pressure.
Nathan Gerdts 9 months ago in InfoWorks WS Pro / Automation 0 Gathering support

Add tool to convert coordinates

Similar to "Convert flow units" and "Convert pressure units" under"Tools", it would be useful to have "Convert Coordinate Units". Coordinates in InfoWorks are meter/feet. Other websites like google maps uses decimal degree. It would be useful to h...
Mohammed Abdallah over 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

graph all sources on a singe graph in quality runs

The graphing tool in a quality run now only alows for two different sources. but I would like to know the consistency of water on any point in time of all defined scource nodes. E.G. the consistency of node X is 36% from source X, 13% from source ...
Pieter Piens almost 4 years ago in InfoWorks WS Pro / Water Quality 0 Gathering support

Allow sequencing of simulations and selections lists

It would be good if we can change the sequence of the simulations, selection sets etc to make them easier to find - especially when creating different scenarios
Ashwini 10 months ago in InfoWorks WS Pro / Other 1 For Review