Showing 288 of 1372

Exceedance Level in Infodrainage

It would be good to have an option in underground stormwater controls to have a separate option for exceedance level and Ground Level By taking the exceedance level as GL, it makes the Long sections look distorted when in reality it is common for...
Guest about 3 years ago in InfoDrainage 1 Already exists

InfoDrainage - Permeable Paving

It would be useful to have a central granular conveyance trench beneath permeable paving to avoid the need for overly deep sub base beneath the road / drive.
Guest about 3 years ago in InfoDrainage 1 Already exists

Import EPASWMM5 Files

Importing EPASWMM5 files for US users would help to streamline the transition from SSA (you can export to SWMM5 from SSA)
Guest about 3 years ago in InfoDrainage 2 Under consideration

InfoDrainage - Split subcatchments option for Laurenson runoff routing method

It is industry best practice to split up the subcatchments in a model into their pervious and impervious areas when adopting the Laurenson (or RAFTS) runoff routing method ie U = 2 and U = 0. The current workflow to achieve this is to setup the mo...
Guest about 3 years ago in InfoDrainage 1 Under consideration

Rename Pages in Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos

Provide way to rename Pages on Observed vs Predicted Graphs to Flow Monitor/ Depth Monitor nos. If there are considerable nos of FM/ DMs, an individual has to go through page nos to find out which FM is checked/verified. Facility to rename the pag...
Salam Jamadar over 4 years ago in InfoWorks ICM / Productivity / Results 1 Gathering support

Post processing scripts as part of a live simulation

We need to be able to automatically run scripts at the completion of our forecasts. it would be extremely helpful if we could have these scripts as part of the manifest workflow so that they started as soon as the results export task completed.
Richard Body almost 6 years ago in InfoWorks ICM / Live Modeling / Results 0 Gathering support

Possibility to get the results from all timesteps for every section of a river reach by Ruby scripting

Now there are only two options: get the results for all timesteps for the first section of the reach (results-method), or get the results at all sections, but only for the current timestep (result-method). I would like to be able to query the resu...
Michael Huybrighs about 2 years ago in InfoWorks ICM / Results 0 Gathering support

Statistical Analysis of ARR Temporal Pattern Ensembles should be enabled

Infoworks ICM should aim to facilitate statistical analysis of temporal pattern ensembles of ARR with a single click. Easily accessing and reviewing the statistical parameters for the required temporal pattern ensembles will allow Australian users...
Guest over 1 year ago in InfoWorks ICM / Results 0 Gathering support

Change upstream pipe connections

The ability to reassign the upstream component of a connection would be so useful. You can bulk import stormwater features and connections from AutoCAD but InfoDrainage does not seem to recognise when the connection is from the stormwater feature ...
Chloe Spencer about 1 year ago in InfoDrainage / Other 0 For Review

Better hydraulic representation of flow in permeable paving

Flow through permeable paving does not occur as one would expect. Is greatly affected by the shape and direction the paving is drawn in InfoDrainage. When drawing an irregular shape the hydraulic grade lines appear incorrect, with flow all at one ...
Guest about 1 year ago in InfoDrainage / Hydraulics 0 For Review