Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 288 of 1370

CAD Data Layer Controls

When you have your CAD files in the drawing, you can control what layers show up. However, you can only select one at a time, you can't sort, and often your selections will reset. This would improve the plan view controls quite a bit.
Jess Ewing over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Add a storage structure feature for channel drains

Add a storage structure feature for channel drains (e.g. channel, slot drain, kerb drain) so that these features can be presented as storage and not only conveyance (by modelling a custom section) and so that catchments can be connected as a sheet...
Oliver Dodd about 1 year ago in InfoDrainage / Hydraulics 0 For Review

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest over 4 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Vary infiltration with depth

Cannot currently use the software for deisgn of borehole soakaways. By their very nature they wil have varying infiltration rates. Usually the infiltration is at greatest depth and no way of modelling with correct head in borehole.
Guest 11 months ago in InfoDrainage / Hydraulics 1 For Review

True Ground Profile on Long Section Exports

It would be very useful if there was a way for the true ground profile to also be exported on long sections. Currently, when exporting long sections from microdrainage, the true ground levels are only shown at manhole locations and a straight line...
Guest about 3 years ago in InfoDrainage 2 Already exists

Manhole Schedule Numbering

For MH tables and report outputs, it would be good to have an option to report chronologically, e.g. 1-30. I understand it numbers them on the first Manhole built in the model however I think it would make more sense to go from shallowest to deep...
Guest about 3 years ago in InfoDrainage 3 Already exists

Time of Concentration (TR-55) Calculator

Although the software has a TR-55 calculator for time of concentration, it doesn't work properly and also needs additional options added. Currently it isn't functional, because the software doesn't allow you to use only 1 or 2 of the 3 flow condit...
Nick Brewer over 1 year ago in InfoDrainage / Hydrology 2 For Review

Zoom (flexible) graphs once x-axis values set

When using flexible graphs (including obsevered predicted, etc) in ICM, there is the possibility to specify the x-axis extents (i.e. time and date) explicitly via the data dialogues. However, once I have specified them this way, the traditional zo...
Iain Scott 7 months ago in InfoWorks ICM / Results 0 Gathering support

Allow underdrains to receive upstream flows from a pipe. Repair inflows to SuDS.

The SuDS nodes do not allow the inflows from an upstream pipe to connect directly to the underdrains. There are only options to connect them through no delays to subsurface areas (i.e. in bioretention nodes) or as a point inflow (i.e. filter drain...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Ability to add a customer line on a graph

It would be nice if you had the ability to add a line on to a graph at a specific interval on the axis. This would make it easier to visual if a specific level has been reached, for instance.
Alex Grist 7 months ago in InfoWorks ICM / Results 1 Gathering support