Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 169 of 1370

Structure flow mode reported in the results

Sometimes when evaluating results at structures we see strange results that require investigation; invariably we find out that this is because the flow mode has changed. (e.g. from free to drowned). It would be very helpful if the ICM results were...
Richard Body over 5 years ago in InfoWorks ICM / Grids / Reporting / Results 0 Gathering support

ICM - Statistics Template: Daily events

I want to be able to break my events into daily values. Currently this would require setting up 7 separate templates each with the unique day set under the 'Time Window' button. I want a tick option added that will allow me to do this within the s...
Guest over 4 years ago in InfoWorks ICM / Reporting / Results 1 Gathering support

Field construction year reference for simulation run.

The field construction year of each object type from WS Pro are not linked to the simulation runtime, so you can get information for future infrastructures that you need to move away from your model or transfer to a new model or scenario. It wo...
Guest about 2 years ago in InfoWorks WS Pro / Engine 1 Gathering support

Copy/Paste Run Setup messages

Currently you cannot copy/paste setup error/warning messages from the Schedule Hydraulic Run Window in order to further investigate. This feature would be particularly useful for troubleshooting more complex runs ie TS.
Guest about 1 year ago in InfoWorks WS Pro / Productivity 0 For Review

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Add new run groups and move existing runs to these

I’ve currently got one very big run group which should’ve really been split into several different ones. Is there a way to move around runs? In the explorer there’s only really the option to duplicate.
Guest almost 6 years ago in InfoWorks WS Pro 0 Gathering support

Implement an optimising tool back into WS Pro

Develop an optimiser tool similar to the InfoWater Designer tool for WS Pro. Optimatics Optimiser is expensive so does not allow all of the market access.
Guest about 1 year ago in InfoWorks WS Pro / Automation 0 For Review

Wet Well Graph

As a modeler, I would like to see a plot showing everything for a pump station in one place. See the attached figure. Inflow/outflow and the flows from each pump. The 3D chart helps a lot showing which line is which.
Guest over 3 years ago in InfoWorks ICM / Results 0 Gathering support

The ability to create multiple Selection Lists at once

I am currently working on a model with a large number of DMAs. This means I have to select each specific area, and save this as a selection list - so I can easily identify areas in the future. This is a very time consuming task, and the ability to...
Sam Bonnington over 2 years ago in InfoWorks WS Pro / Automation 1 Gathering support

Max or Min Flow values should not depend on the pipe direction. i.e. the value being positive or negative depend on the pipe direction

Currently, if the flow direction through the pipe is opposite to the direction of the pipe drawn it shows as a negative flow value. So if the flow goes both direction during the run, smaller positive value shows as the maximum flow and larger nega...
Guest almost 5 years ago in InfoWorks WS Pro / Other 0 Gathering support