Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 171 of 1372

InfoAsset Online - "Sort by the date" option in selection grid

If there is a way to put the surveys which are part of a Work Package search into date order, It would be beneficial to our users. Some of our jobs involve several visits and it would be better for the user to be able to see the latest surveys at ...
Guest over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Graph sum of multiple objects instead of each selected object

While looking at multiple drainage areas in a basin (in my example), results can become hard to read; it would be nice if you could graph multiple objects and have the option to see the summation of the selection instead of each individual item.
Andrew (AJ) Czubai almost 3 years ago in InfoWorks ICM / Reporting / Results 0 Gathering support

Project Prioritization: Include multiple asset types in a single project

Currently, the Project Prioritization tool can only be run on Gravity Mains or Pressurized Mains separately. It'd be great if the tool could create projects after looking at Gravity Main AND Pressurized Main information or any other asset types. B...
Guest almost 6 years ago in Other Product Ideas / Asset Management 0 For Review

Create a COF/LOF utilizing an Upstream/Downstream Trace

I would like there to be an option to create a COF or LOF based upon an upstream or downstream trace from a feature. For example, an upstream/dowsntream trace from a pump station for X amount of feet.
Guest over 4 years ago in Other Product Ideas / Asset Management 1 For Review

Modelling of Septicity

As a sewer modeller I have occasionally been asked about odour generation in sewer networks. I have noticed that DO (dissolved oxygen) and BOD (biochemical oxygen demand) are both inputs in the wastewater and trade-waste model groups of Infoworks ...
Guest about 6 years ago in InfoWorks ICM / Results / Simulations / Water Quality 0 Gathering support

Autofill missing GIS assets based on PACP/MACP data

When importing sewer inspection data, if an asset (manhole / pipe) is not found, then a "dummy" asset is inserted automatically by InfoAsset Planner as a placeholder to be able to continue working without having to edit the GIS. PACP/MACP data as ...
Bryon Wood about 6 years ago in Other Product Ideas / Asset Management 0 For Review

Integration with Power BI

As a user I would like to be able to integrate InfoAsset Manager with Power BI for KPI dashboard reporting
Guest about 6 years ago in Other Product Ideas / Asset Management 1 For Review

Be able to drag the grid window off main interface to another monitor.

Drag grid window to another screen, just like an attribute table in ArcMap/ArcGIS Pro. Allowing more relaxed and open use of grids, with much less scrolling through tight windows.
Guest almost 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 For Review

Document how results pfc vs r.pfc are calculated for open channels

in the long plots we ask for two capacities, we get pfc vs r.pfc for pipes they are the same , but for open channels such a trapezoidal they are different. there seems to be no literature on this.
John Krpan over 1 year ago in InfoWorks ICM / Results 3 Will not implement

Better documentation on XPX/XPTABLES to map UI element to variables

I would like for Innovyze to create a complete list of all the codes that can be used in XPX or XPTables, with descriptions of how they are used, and/or make it very easy to find out what those codes are. For example, NKLASS is used in XPX to ...
Guest about 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support