worst case Grid report to include min values

Can the worst case grid report be enhanced to include minimum values for velocity and flow, similar to how it currently reports maximum upstream and downstream flow? This addition would be highly beneficial for understanding hydraulic behavior dur...
Parameswara Rao Narra 7 months ago in InfoWorks ICM / Results 3 Already exists

Display critical results for indvidual elements

With the variability of design rainfall patterns, critical hydraulic results (mean/median/min/max) often occur at different rainfall durations for different elements (eg specific pipe/MH/channel/etc) within a network for the same rainfall event pr...
matthew.piggott about 1 year ago in InfoWorks ICM / Results 2 Already exists

Automatically clean completed items from Job Control window

When using InfoWorks ICM across a workgroup server, all the simulations are visible by all users in the job control window. To keep the list manageable this requires each individual user to remember to click remove completed jobs regularly. As lon...
Tom Walker over 1 year ago in InfoWorks ICM / Results 2 Already exists

Log locations that most often cause timestep halving during a simulation

The "Job Progress" window provides information of the location that cause multiple iterations or reduced time-steps in the 1D model, under the headings "Link fail H", "Link fail Q", "Node fail". This is useful for diagnosing potential locations of...
Manu Ward about 2 years ago in InfoWorks ICM / Results 2 Already exists