Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 249

Improve XPSWMM Migration Workflows

Improve import process with UI to allow selection of import items Update xpx export to include all remaining critical items Remove dependency on XPSWMM installation Update ICM importing process to IW networks Update ICM importing process to SWMM n...
Sophia Buchanan about 3 years ago in InfoWorks ICM / Import data / InfoWorks / SWMM 0 Launched

Risk and Rehab On Water Networks

Analysis tools in Info360 Asset, Risk and Rehab, work with water distribution assets.
Mike Maylone over 3 years ago in Info360 Asset / Rehabilitation Planning / Risk Analysis 0 Launched

Integration with Vapar AI

Autocode CCTV videos as they are imported into Info360 Asset. Allow the user to use AI, human, or a combination of the codes.
Mike Maylone over 3 years ago in Info360 Asset / Inspection & Media Management Workflows / Other 0 Launched

InfoDrainage - Please bring back 'percentage available%' in the stormwater control results summary

Developers obviously have no idea how useful this was! Thanks.
Guest over 3 years ago in InfoDrainage 0 Launched

InfoDrainage - Data Transfer to Site3D

How do I transfer my drainage model to and from Site 3D? In Micro Drainage the transfer is quite straight forward and although it isn't perfect, it is reasonably quick. There doesn't seem to be an obvious way of doing the same in InfoDrainage? Roa...
Guest over 3 years ago in InfoDrainage 1 Launched

Slowness of InfoDrainage

My infoDrainage file is about 1600 kb, but opening this file takes me 35 - 50 min! There are no images or any kind of background files, but still it takes years to open! Not sure the exact cause for this slowness! All other modelling software runn...
Guest over 3 years ago in InfoDrainage 2 Launched

Mixed decimal place

I'm using InforDrainage 2023.1 and there are mixed numbers after decimal point. In profile view, there are five digit after decimal point which is unnecessary.
Guest over 3 years ago in InfoDrainage 2 Launched

"Limiting discharge" field/functionality for subcatchments

For large storm events, not all subcatchment runoff will be able to enter the piped system - inflows will be limited by the size (and condition) of roof downpipes, road gullies, etc. Therefore, I would like for ICM to be able to 'cleanly' deal wit...
Jason Kulsdom over 3 years ago in InfoWorks ICM 1 Launched

Export a Scenario

For XPSWMM, I would like to have a feature for the scenario manager to export a scenario as a standalone model. Some times, the end user doesn't want to see all the scenarios. It will be similar to ICM, you can export a scenario as a standalone n...
Guest almost 4 years ago in InfoWorks ICM 0 Launched

Easily break into a conduit with a new node

To be able to insert a node (manhole) onto an existing conduit, and have the conduit split at the new node. the node chamber floor would be at the invert of the conduit at that point and that same invert would be assigned to the replacement condui...
Gregory Smith almost 4 years ago in InfoWorks ICM 1 Launched