Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 69

Switch design return periods when running cascade analysis

I would like to be able to build a single cascade model & able run it for various design return periods instead of needing to create separate cascade models for each return period.
Guest over 3 years ago in InfoDrainage 1 Already exists

Status Bar to report more significant figures

The status bar currently only displays levels (ground model level, water depth) to 1 decimal place. 2 Decimal places would be much more useful, Especially to ensure a node is at a low point or in the gutter invert..
Guest over 3 years ago in InfoDrainage 1 Already exists

Import/export of asset data to/from CSV

DSD import/export for MicroDrainage exists but HydroWorks is now dead. A more generic import/export would be beneficial for exchange of information with other drainage simulation packages and with GIS systems for existing networks; something simil...
Guest over 3 years ago in InfoDrainage 1 Already exists

Snap tool for areas

Just like in CAD DrawNet you can use the CAD tools to snap the points of the catchment areas to specific points, it would be useful to have a snapping tool built into the MicroDrainage program. It could be a simple tool so you can either put a new...
Guest over 3 years ago in InfoDrainage 1 Already exists

Velocity and proportional velocity to be shown on Tables

When designing sewers a critical design criteria is the pipe velocity when full or at design discharge rate. It makes designing sewers quite iterative without this included
Guest over 3 years ago in InfoDrainage 1 Already exists

Improve Snap Marker visibility

Improve the Snap marker visibility as they blend into the object making the snap markers nearly invisible
Guest over 3 years ago in InfoDrainage 1 Already exists

support MS SQL 2022

support MS SQL Server 2022 on Windows Server 2022
Jane Liu over 1 year ago in InfoWorks ICM / InfoWorks 1 Already exists

In some types of elements the result of the simulation between consecutive time step are very different (oscillations).

Simulation results very differents between consecutive calculation times in series or cascade regulation elements; such as, pressure regulating valves (PRV), float valves (FLV), pumps, ...
Juan Carlos Ortega almost 3 years ago in InfoWorks WS Pro / Engine 2 Already exists

Batch CCTV Video and Photo Import for Info360 Asset

I have been working in the Corte Madera project and have ran into a couple of challenges that although not stop blockers, they are very time and resource consuming tasks. Downloading data provided by client: If a client provides 200GB of data, it ...
Martha Nunez over 4 years ago in Info360 Asset / Import / Upload 0 Already exists

Add a "comments" or "notes" option to the 'Reject' status for Field Inspector users to know why Inspection was rejected

There is no way for the inspector to know what is supposed to be fixed.
Guest about 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Already exists