Skip to Main Content
Autodesk
ADD A NEW IDEA

All ideas

Showing 1387 of 1387

Split pipes using the InfoWater "Digitize Network" tool

The "Digitize Network" tool can be used to draw new pipes and junctions, but does not split existing pipes, even though you can snap to existing pipes and add a junction. This can cause confusion because it appears that the pipe has been split whe...
Colin Ricks about 6 years ago in InfoWater Pro 1 Under consideration

Automatically autofit DB table column widths

No description provided
Colin Ricks about 6 years ago in InfoWater Pro / Productivity 1 Gathering support

Reset the active facilities query without changing scenarios

When scenarios use a query set to define the active facilities, it would be useful to be able to re-run the query and update the active/inactive facilities without changing scenarios. Changing scenarios can be very slow for large models.
Colin Ricks about 6 years ago in InfoWater Pro / Productivity 1 Will not implement

Zoom-dependent visibility of flow direction arrows

Flow direction arrows slow down the display significantly when zooming out on a large model. It would be useful to specify the scale at which they will be shown, similar to ArcMap layers.
Colin Ricks about 6 years ago in InfoWater Pro / Productivity 1 Will not implement

Alert on river sections without having to make 1D results points

We'd like to create alerts on river sections without having to create either results points or having the reach split at the cross section in question
Richard Body about 6 years ago in InfoWorks ICM / Live Modeling / River Modeling 0 Gathering support

Automate concurrent Fireflow simulations

When you integrate InfoWater into the InfoWorks platform, it would be great if you could ensure that FireFlow simulations can be scheduled and automatically run sequentially for different network scenarios. As far as I am aware this is not possibl...
Guest about 6 years ago in InfoWater Pro / Engine 0 Gathering support

IWLive Pro to adopt simulation periods of ICMLive

Each simulation has a hindcast period, now and a forecast period
Guest about 6 years ago in InfoWorks WS Pro 0 Gathering support

Local water quality settings.

User can set local water quality parameters and local initial condition of Water Quality in ICM rather than globally. Local WQ parameter should at least contain decay rate, DO process coefficient etc.. As for the local initial condition, DO concen...
Liu Qiusheng about 6 years ago in InfoWorks ICM / Pollutants / Water Quality 1 Gathering support

"jet flow" and agitation (inflow with a certain speed)

In China, efforts are being made to improve black and smelly water bodies. One of the measures is to increase water fluidity to improve water quality through natural purification of water bodies. So there are two measures to increase the fluidity ...
Liu Qiusheng about 6 years ago in InfoWorks ICM / 2D Flooding / Pollutants / Water Quality 0 Gathering support

Water environmental capacity calculation

Add environmental capacity calculation in ICM, user can easily find how much pollution the river can receive at each time step and each river’s total environment capacity during the whole simulatiton. Water Environmental Capacity Calculation Backg...
Liu Qiusheng about 6 years ago in InfoWorks ICM / River Modeling / Water Quality 0 Gathering support