Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 43 of 1442

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis almost 2 years ago in Info360 Asset / Data Editing 1 In progress

Adding Level 3/4 water quality processing to the ICM upm tool.

For future catchment studies, we are looking at completing higher levels of water quality impact assessment, Level 3/Level 4. For this we would like the UPM tool to be able to integrate ICM river models to represent river flows and river quality a...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Parcel Import to Catchment

It would be extremely helpful if InfoDrainage could import Civil 3D Parcels directly as catchment areas, similar to how it currently imports other CAD data (polylines). Parcels often represent drainage catchments, lots, or contributing areas in si...
Guest 6 months ago in InfoDrainage / Data Exchange 1 Gathering support

ICM UPM tool - running all impact durations at the same time

For any CSO assessment we do, we always have to compare standards for all impact durations (1hr, 6hr, 24hr). We’ve found setting up the tool the exact same way 3 separate times, only selecting a different impact duration, very slow and inefficient...
Guest over 2 years ago in InfoWorks ICM / Water Quality 0 Gathering support

Split CCTV inspections when a manhole gets installed

This should be done in cases where a pipe gets split into two assets because a manhole was installed along the length of the original asset. The CCTV inspection would have to be 'split' into two inspections to accurately represent the condition da...
Martha Nunez over 2 years ago in Info360 Asset / Data Editing 0 On roadmap

SWMM Export from InfoDrainage

Certain authorities use other SWMM-based software for review purposes or as their city-wide model that needs to be updated. We need to export a SWMM file for more universal submittal purposes, even if InfoDrainage uses a modified SWMM engine.
Midori Patterson about 2 years ago in InfoDrainage / Data Exchange 3 Under consideration

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest about 1 year ago in InfoDrainage / Data Exchange 0 For Review

Management of Siltation module within ICM Live

As part of our ICM Live system we use the Siltation module. While this creates a dynamic siltation on each pipe, there isn't an easy way to manage it. Once a pipe is cleaned we need to stop the live model and potentially apply all the dynamic silt...
Jose Pereira almost 5 years ago in InfoWorks ICM / Live Modeling / Water Quality 0 Gathering support

Merge Phases

It would make life much easier if there was the ability to merge multiple phases together, instead of having to duplicate elements between phases. Duplication doesn't wholly work because connections can't be duplicated between phases.
Guest about 1 year ago in InfoDrainage / Data Exchange 0 For Review

Change pipe material based on inspections

Many utilities confirm or update pipe materials in their GIS data based on inspections; this is a feature that is possible within IAP. This was accomplished by comparing GIS materials to the imported inspection materials within the Validation tool...
Kim Solberg almost 2 years ago in Info360 Asset / Data Editing 1 Gathering support