Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 234 of 1370

NOAA Durations

InfoDrainage supports only a limited subset of NOAA Atlas 14 storm durations: 360 minutes (6 hours), 720 minutes (12 hours), 1440 minutes (24 hours), and 5760 minutes (4 days). However, NOAA Atlas 14 provides a broader range of precipitation durat...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest about 1 year ago in InfoDrainage / Reporting 2 For Review

Allow two Infodrainage files to be combined

Request for a paste, copy, cut branch to file options, to allow two Infodrainage files to be combined. As the available in Microdrainage
Guest over 1 year ago in InfoDrainage / Other 2 Under consideration

Multiple return period hydrograph

Currently, InfoDrainage restricts each hydrograph to a single return period, which creates inefficiencies when analyzing stormwater systems across multiple design storms. To accommodate analyses for 2-, 10-, and 100-year events, for example, users...
Guest 7 months ago in InfoDrainage / Hydrology 0 For Review

Enable 3d view of two phases (foul and surface) simultaneously to help resolve clashes found in clash analysis.

Clash Analysis identifies pipes touching, which may be in different phases. The ability to view both phases in 3D View (as you can in Plan View) would make resolving the clashes much more efficient.
Guest about 1 year ago in InfoDrainage / Auditing / Reviewing 0 For Review

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 7 months ago in InfoDrainage / Reporting 0 For Review

Sewer Design - Area Density Method

Area Density method is recommended to be incorporated in Infodrainage as it offers improved accuracy and aligns with Indian flow calculation standards which could enhance the reliability of the outputs. This method is described in Indian Guideline...
matthew.piggott 7 months ago in InfoDrainage / Other 1 For Review

Provide Enhanced Manhole Schedule Details

It would be great to have the option of providing an additional level of customisable detail which could be configured on MH Schedules. As an example including practical details around the cover – contractors want to know and see more from a MH s...
Guest about 3 years ago in InfoDrainage 1 Gathering support

Use outflow from one phase as inflow into another phase.

When working on large, multi-phase projects in InfoDrainage, it is common practice to model each development phase in different InfoDrainage phases. However, challenges arise when runoff from one phase discharges into another. Currently, users mus...
Guest 10 months ago in InfoDrainage / Data Exchange 0 For Review

Flooding extents boundary

Would like the ability to export the maximum 2D flooded boundary so I can show this in Civil 3D.
Guest 10 months ago in InfoDrainage / 2D Flooding 2 Already exists