Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 176 of 1370

Cumulative Inflow Areas Against Junctions and Connections Results

In order to aid the quality assurance process that exists throughout drainage design, it would make life much simpler to have a cumulative contributing inflow area against junction summaries. Being able to sense check results with the contributing...
Guest 6 months ago in InfoDrainage / Reporting 2 Gathering support

Support for ArcGIS Enterprise Portal (public)

Integrate with ArcGIS Enterprise Portal
Mike Maylone over 2 years ago in Info360 Asset / Esri 6 In progress

Labeling manhole and pipe IDs in the Map

It makes it easier to QAQC data, or simply determine which asset it being viewed in the Map.
Martha Nunez about 2 years ago in Info360 Asset / Data Management 3 On roadmap

Comparison of total length of rehab methods vs total pipe length

Similar to 'Comparison of total length of defects vs total pipe length' however, rehab methods can be assigned to multiple defects. For example the rehab method 'lining' can be assigned to defect codes CC, CL, FM, etc. the total length of a rehab ...
Martha Nunez about 1 year ago in Info360 Asset 1 Gathering support

Allow CCTV Inspections to be associated to a pipe/culvert when PLR and asset IDs match but no manhole IDs are provided in the CCTV inspection

Allow inspections to be imported WITHOUT (i.e. missing) manhole IDs but still provide the association to the asset via the PLR if a corresponding pipe asset has the same asset ID. In the situation where there are no manhole IDs provided then I360A...
Tony Andrews over 1 year ago in Info360 Asset 0 Gathering support

User owned templates that can be shared across projects

With this feature, a user could save an already created risk or rehab analysis as template that they could utilize in other projects. This would save consultants and resellers a large amount of time from conducting repetitive processes.
Guest over 1 year ago in Info360 Asset / Product workflows 1 On roadmap

Allow all uploaded fields as accessible for risk analysis

The risk analysis by attribute can only support a limited number of pre-configured fields. Users might have additional fields they want to include in their risk analysis (see example of IAP risk compared to Info360 Asset dropdown). Right now, this...
Tim Medearis over 1 year ago in Info360 Asset / Data Editing 1 In progress

Calculating and adding the Froude number to storm table output

Many municipalities and utilities want to maintain subcritical flow in the storm sewer system and avoid hydraulic jumps. The Froude number is used to establish subcritical vs. supercritical flow.
Guest about 1 year ago in InfoDrainage / Reporting 2 For Review

ARR critical storm analysis in Comparison Report

Please update the comparison report feature in InfoDrainage to allow ARR design storms - critical storm per drainage element. We currently cannot compare phases when using ARR storms.
matthew.piggott 7 months ago in InfoDrainage / Reporting 0 For Review

Support for defect specific rehabilitation methods and costs

In many cases, the rehabilitation of a pipe is done in a localized manner such as it is the case for point defects like breaks, holes, etc. A pipe might need one, or multiple of these localized repairs. When analyzing the cost and planning for rep...
Martha Nunez over 2 years ago in Info360 Asset / Query types / Capabilities 1 Gathering support