Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Productivity

Showing 24 of 1423

show upstream and downstream cover depth for connections

MicroDrainage used to show this its useful for checking cover to pipes are correct
Matt Hare over 1 year ago in InfoDrainage / Productivity 0 For Review

Pipe clash detection when foul network phase is active

When working through clashes between surface water and foul networks, you can only access the pipe clash analysis within surface water analysis tab. This means if I want to change the depth of the foul network to avoid the clash then I have to swa...
Henry Wilkinson 10 months ago in InfoDrainage / Productivity 1 For Review

Allow different Phases to use the same background files

When creating a new network through phasing we often wish to use the same CAD levels and background used by another network, without having to load another version of the same CAD files.
Guest over 2 years ago in InfoDrainage / Productivity 1 Will not implement

Show manhole types in manhole schedule export

Manhole schedules need to feature cover types (D400, C250 etc), manhole types (Type A, B, C in Scotland etc) and whether they're a backdrop or a headwall etc. Having a feature to assign this based on location on site (cover type), depth to soffit ...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Reverse Flow Direction

In cases where the pipe direction in the CAD/GIS source file is incorrect, the imported flow direction in InfoDrainage also follows the same (incorrect) path. Rather than correcting the geometry externally in CAD or GIS, is there a built-in option...
Jana Anbu 11 months ago in InfoDrainage / Productivity 2 Will not implement

"Show Maxima" Button

It would be great if there were a "show maximum" button like there is in InfoWorks ICM where you can see at what point in the simulation there is the most surcharge. this would save time trying to manually move the timeline to exactly where someth...
Midori Patterson about 2 years ago in InfoDrainage / Productivity 1 Gathering support

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest over 1 year ago in InfoDrainage / Productivity 1 Gathering support

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review