Skip to Main Content
Autodesk
ADD A NEW IDEA

Hydraulics

Showing 25

Need more inlet options

SSA has numerous inlet manufacturers and jurisdictions, including Caltrans, FDOT, Neenah, etc. These would be beneficial to have in InfoDrainage, including East Jordan inlets. Additionally, have depth vs flow curve option would be helpful as well.
Guest 7 months ago in InfoDrainage / Hydraulics 0 For Review

Limit the chamber sizing calculator to 200 chambers

The chamber size calculator will add any number of chambers necessary, however, the model will not validate if the number of chambers exceeds 200. It would be better to not allow the calculator to exceed the validation limit.
Daniel'le DeVoss 5 months ago in InfoDrainage / Hydraulics 0 For Review

Increase the limit of Chambers allowed

Currently in the 2025.2 version I am running, the number of Chambers for subsurface storage/detention allowed is 200. The sizing calculator says I need more and wouldn't validate the model. Would be nice to have a higher limit.
Bryan Forrest 5 months ago in InfoDrainage / Hydraulics 0 For Review

Robust pond editor

Add options for complex pond shapes and items. Many municipalities now require items like latorial shelves, forebays, baffles, etc. these items do influence the detention time in the pond and can have effects on staging. While the size items can b...
Corey Balenger 5 months ago in InfoDrainage / Hydraulics 0 For Review

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest 7 months ago in InfoDrainage / Hydraulics 0 For Review