Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 116 of 1370

As an organization, we would like the ability to choose an alternative final risk calculation method.

So, InfoAsset Planner currently only provides the user one way of calculating a final risk score from chosen COFs and LOFs, and that is to sum the scores from all that are included in that risk model. It would great if the user could choose the ...
Guest almost 6 years ago in Other Product Ideas / Asset Management 5 Gathering support

UNDO Button

We all make mistakes!
Guest over 5 years ago in Other Product Ideas / Storm, Sewer, Flood Modeling 0 Gathering support

Display linked live data in long section view

When calibrating a model with multiple pressure loggers, it would be useful to see reference HGL's in the Long Section view at any points with live data. This could be represented as floating points based on the current timestep. This helps unders...
Nathan Gerdts over 2 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

arcgis pro as map control

Can we please add the ability to use ArcGIS Pro as an option in the Map Control of InfoAsset Manager?
Guest about 4 years ago in Other Product Ideas / Asset Management 0 Will not implement

INTERLIS format importer of XML data for CCTV and Manhole Survey data

Support the importation of INTERLIS format XML data of CCTV and Manhole Survey data
Krzysztof Tchorzewski 7 months ago in Other Product Ideas / Asset Management 0 For Review

PACP Split Survey observations enhancements

The issue is when the application is asked to split a survey and the survey is a PACP inspection, NASSCO expects a few things to be on the inspection. First, the first code on the inspection should be AMH with remarks (this could be the node that ...
Krzysztof Tchorzewski over 1 year ago in Other Product Ideas / Asset Management 0 For Review

Enhancement of the CSV option for Live data configuration

currently it is possible to use a csv in the live data file for a single set of data, however most it would be useful if you could have a csv with date time down the side and multiple flows or pressures across the way (Header row of Date Time, Pre...
Duncan Allen over 1 year ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Smart meters

Water utilities in Australia are installing smart meters in domestic and other non residential properties. Smart meters generates large data sets at each and every individual properties. Any thoughts to integrate those data in to the distribution ...
Guest almost 6 years ago in InfoWorks WS Pro / Data Exchange / Telemetry 2 Under consideration

InfoAsset Online - Add Head Discharge Grid and Graph

This appears to be missing in IAO yet it is present in IAM. It is needed in IAO.
Jim O'Dowd about 2 years ago in Other Product Ideas / Asset Management 0 For Review

InfoAsset Planner - When Running an Analysis or Data Miner, Recalculate Precedents prior to Run

Allow the Analysis Run to recalculate precedent Analyses before running itself. I realize that Batch Run calculates all Analyses from top to bottom however if a COF references a Data Miner which referenced a preceding COF, the data will not neces...
Bradley Nissley almost 6 years ago in Other Product Ideas / Asset Management 0 Under consideration