Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 27 of 1370

Basin / Swale inlets pick up IL at point of entry, not the bed level

Inlets automatically pick up down stream bed level of SWC. Inlet pipes have to be locked, with the IL's calculated manually which can be difficult to get right along a basin or swale that is long and winding. Would it be possible for the IL pipe t...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Support variable speed in live data

Variable speed is now an unsupported attribute in live data.
Evi Loozen almost 6 years ago in InfoWorks WS Pro / Telemetry 2 Under consideration

Sensor Objects for maps and comparisons

I want to see and interact with my sensors on the map. These could be generated from existing Live Data Points on model objects, and/or imported from GIS and joined spatially to model objects. Sim results could store the sensor data for the Run pe...
Nathan Gerdts about 1 year ago in InfoWorks WS Pro / Telemetry 0 For Review

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

Excel export of pipe results

when outputting drainage schedules ( the default used in InfoDrainage is no good as lots of information cannot be selected) there was a simple and effective way of exporting the relevant info ( pipe number/diameter/gradient/us il/ds il/ cover leve...
Steven Gilchrist over 2 years ago in InfoDrainage / Productivity 1 Already exists

When drawing infiltration trench, let me hold shift to invert which side of the trench i draw first

When drawing the trench, it is usally easier to draw the side along which im working against (IE a footpath edge) first, and then the width. Othewise i then have to rotate the object. Allow a user input by holding shift while drawing to allow user...
Guest over 2 years ago in InfoDrainage / Productivity 1 Already exists