Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 21 of 1370

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support

Control units precision in long plots and grid plots

it would be nice to be able to control unit precision such as volume in m3 to a whole number when reported volume is in the 400000 m3. we do not need to see 4 digits past the decimal!!
John Krpan over 1 year ago in InfoWorks ICM / Long Section / Profile 0 Gathering support

ICM Template for printing muti-page Geoplan and Long Section views

I can already batch print geoplans and Long Sections by themselves. How to print them together? My current approach is to learn how to manipulate the output PDFs using PDF TK server, ghostscript, and potentially pdfjam, but some of these are new t...
Guest over 3 years ago in InfoWorks ICM / Long Section / Profile / Printing 1 Gathering support

Export Flood Profile from ICM to AutoCAD Civil 3D Profile file

While exporting to AutoCAD DWG file format is ok - we used AutoCAD Civil 3D for drawing profiles. Can you just create a Profile file? or use LandXML to represent this information. From the Autodesk Help: About the Format Requirements of Profile F...
Guest about 6 years ago in InfoWorks ICM / Long Section / Profile 1 Gathering support

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Multiple Conduit Selection

The Select downstream (or upstream) links button is of limited use. Typically, I would like to select all downstream CONDUITS, in order to create a long section, but I find ICM arbitrarily include overland links (curb & gutter) between nodes a...
Gregory Smith almost 4 years ago in InfoWorks ICM / Long Section / Profile / Productivity 0 Gathering support

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

Interconnect 2 longprofiles

When 2 sim results are placed on 1 long profile (with the Open as alternate result option) only the water heights are used to visualize sim2. Sometimes these pipes have different invert levels which makes a comparison on 1 long profile rather usel...
Guest about 5 years ago in InfoWorks ICM / Long Section / Profile 0 Gathering support