Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 29 of 1370

Show manhole types in manhole schedule export

Manhole schedules need to feature cover types (D400, C250 etc), manhole types (Type A, B, C in Scotland etc) and whether they're a backdrop or a headwall etc. Having a feature to assign this based on location on site (cover type), depth to soffit ...
Guest over 1 year ago in InfoDrainage / Productivity 0 For Review

Allow different Phases to use the same background files

When creating a new network through phasing we often wish to use the same CAD levels and background used by another network, without having to load another version of the same CAD files.
Guest about 2 years ago in InfoDrainage / Productivity 1 Will not implement

Add a feature for deselection of a group of elements in Geoplan

Many times we use polygon select feature to select elements in a particular extent, but there is no option of deselecting a small area within that selection - like in Arc Map
Ashwini 10 months ago in InfoWorks WS Pro / Operations 1 Gathering support

"Show Maxima" Button

It would be great if there were a "show maximum" button like there is in InfoWorks ICM where you can see at what point in the simulation there is the most surcharge. this would save time trying to manually move the timeline to exactly where someth...
Midori Patterson almost 2 years ago in InfoDrainage / Productivity 1 Gathering support

Reverse Flow Direction

In cases where the pipe direction in the CAD/GIS source file is incorrect, the imported flow direction in InfoDrainage also follows the same (incorrect) path. Rather than correcting the geometry externally in CAD or GIS, is there a built-in option...
Jana Anbu 8 months ago in InfoDrainage / Productivity 2 Will not implement

Allow changing displayed simple junction size

In plan view we are able to change the sizes of icons, labels, proper manholes and many other parts of our pipe networks, but the symbology for simple junctions is fixed in size (at about 1.2m?) and cannot be changed, which makes modelling, for ex...
Guest 11 months ago in InfoDrainage / Productivity 0 For Review

Add the ability to duplicate connections between phases

Currently it is possible to duplicate stand-alone objects to different phases. Connections are not included in this. To duplicate connections to a different phase, the engineer must export the connections to a different format then re-import those...
Guest about 1 year ago in InfoDrainage / Productivity 1 Gathering support

Option to compare Simulations of different time ranges superimposed on one graph [IWLive]

As an operator, I want to compare today's forecasted operations with different days in the past so I can see alternative ways how similar situations played out and make decisions with confidence. IWLive already offers functionality to compare two ...
Nathan Gerdts 7 months ago in InfoWorks WS Pro / Operations 0 For Review

Amended multiple pipe and manhole names along a flow path in one operation

It would be helpful if you could rename an entire branch or flow path in one operation rather than each part individually.
Guest about 1 year ago in InfoDrainage / Productivity 0 For Review

Distribution Network Energy Optimization

Minimize the pumping costs of water distribution while satisfying water demand and operational constraints (water levels, pressure, pump station capacities, future maintenance operations, etc).
Nathan Gerdts over 1 year ago in InfoWorks WS Pro / Operations 0 Gathering support