Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 20 of 1370

Report manager should populate without running model

Currently, the report manager is only populated once results are shown. This makes it so that the only place I can view the model data before running, is the data base manager. You should be able to have the report manager populated without runnin...
Endrit Shabani almost 2 years ago in InfoWater Pro / Other 0 Gathering support

Option for "downstream node" when allocating demand by pipe

The current "farthest node" option I believe just places the demand at the opposite end of the pipe compared to the meter point. Instead I'd like an option for all the meter demands to be placed at the pipe's end node. "Downstream" would probably ...
Eric King 11 months ago in InfoWater Pro / Other 0 For Review

Specify number of demands

I almost never need to use all 10 demand fields in InfoWater. The ability to specify the number of demand fields needed would save space in the demand DB table and in the Model Explorer window and make viewing these windows easier.
Colin Ricks almost 6 years ago in InfoWater Pro / Other 3 Under consideration

Edit Pump and Valve Curves in IWLive

IWLive is the perfect platform to examine how well valve and pump curves are simulating the actual behavior under a wide range of system conditions. If these could be modified in an incident run, it would save lots of time going back to WS to modi...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

Account for multi-connection properties during criticality analysis

Some hospitals for example have multiple service laterals connecting them to the network. If one line is cut off from service due to a repair, the hospital can still get water. As a result, criticality is overestimated when this logic is ignored. ...
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Apply two-valve isolation for criticality analysis

For some projects we need to isolate the repair area with two closed valves in all directions in case one valve were to fail. Please incorporate this as an option in criticality analysis when summing affected customers
Nathan Gerdts over 2 years ago in InfoWater Pro / Other 0 Gathering support

Creation of the Pump element independent of its grouping in the Pumping Station as included in usual infrastructure catalogs (GIS)

Useful for maintaining the unique relationship between the elements of a supply network and the Infoworks model objects.
Juan Carlos Ortega over 2 years ago in InfoWorks WS Pro / Operations 2 Will not implement

I want more flexible shutdown runs

e.g.: I want to be able to evaluate shutdwon of pumping stations in 1 one run, now I have to create a seperate run for each pumping station. A workaround I use is closing links with a GRM config, but this only shuts down links for the whole simula...
Caroline Heylen almost 4 years ago in InfoWorks WS Pro / Operations 1 Under consideration

A simple way to get an upstream or downstream trace analysis for all objects (node or pipe)

In WS Pro Upstream/downstream tracing is easy for a single object. Obtaining a single useful value (i.e. property count) is easy for multiple objects. Combining the two is very difficult at the moment in WS Pro I want to be able to obtain, eithe...
Guest over 5 years ago in InfoWorks WS Pro / Operations 0 Gathering support

User guide and example for Sustainability Module in InfoWater

I'm currently trying to figure out how to use the Sustainability Module and ensure my results are reasonable and it would be handy if like other modules it has a test module with documentation and tutorials.
Guest almost 6 years ago in InfoWater Pro / Other 0 Under consideration