Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 288 of 1373

Inclusion of FEH UK Rainfall Data

Can FEH rainfall data (all versions) be available to select just like it is for FRS data in the rainfall manager rather than having to retrieve these from another website. More and more authorities are asking for FEH data to be used
Guest about 1 year ago in InfoDrainage / Rainfall 1 For Review

Insert polygon

Allowing this option to insert a polygon shape will be beneficial. avoid wasting time to draw a perfect boundary free hand. Basic shapes like circle, rectangle / square can be added.
Guest over 2 years ago in InfoWorks ICM / GIS Layers 2 Gathering support

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest over 2 years ago in InfoDrainage / Other 1 Gathering support

Collapsing walls identified in the log file

Can we have the status of base linear structures included in the log file? I have a large model where I have lots of these and I need to interrogate each one in turn. It would be much easier if the log file (or, better still, a grid view) showed t...
Richard Body over 5 years ago in InfoWorks ICM / Reporting / Visualization 0 Gathering support

Import\Export ESRI ArcGIS Pro data into InfoWorks ICM

I would like to exchange data between InfoWorks ICM and ESRI.
Guest about 4 years ago in InfoWorks ICM / GIS Layers / Network 1 Gathering support

Orifice and Grate options - Outlet Control Structure

I suggest incorporating advanced features for modeling orifices and grates. Specifically, the following modifications would be beneficial: Orientation Settings: Introduce options to define the orientation of orifices and grates, allowing users to ...
Guest over 1 year ago in InfoDrainage / Hydraulics 0 For Review

5min Storm Duration for ARR Analysis

Currently, the minimum duration for storms built by the ARR generator is 10min. For drainage design in Aus the minimum time of concentration is 5min. The BOM IFDs give a 5min intensity/depth while the ARR Data hub only gives 10min temporal distrib...
matthew.piggott over 1 year ago in InfoDrainage / Rainfall 1 For Review

Looking for Velocity in new Flex Reporting

Is velocity included? Having trouble finding this parameter in the new flex report
Jess Ewing over 1 year ago in InfoDrainage / Reporting 3 Already exists

Adjustable coordinate system for better real-life representation

Having the opportunity to change the coordinate system of a project would be a great addition to Infodrainage. It is currently a matter of manually adjusting a background to match the designed network components which is not very accurate and can ...
Guest over 1 year ago in InfoDrainage / Visualization 1 Gathering support

Visualise DWG in the background

As a user migrating from XPSWMM I want to be able to use a DWG as a background file so that I can find my bearings in my InfoWorks model
Sophia Buchanan about 3 years ago in InfoWorks ICM / Visualization 0 Gathering support