Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 40 of 1442

Allow other date formats for time series data upload

It is inconvenient to convert dates from dd/MM/YYYY HH:mm:ss to MM/dd/YYYY HH:mm:ss
Brad Thompson over 2 years ago in Info360 Insight / Sensor Configuration / Management 0 Gathering support

Correct resizing of pop-up windows activated through C3D toolbar

Due to issues with my eyesight I use the accessibility settings on my computer to increase the standard text sizes for applications. When using the InfoDrainage toolbar in Civil 3D pop-up menus don't resize to match the updated display settings. I...
Michael McWhinnie over 1 year ago in InfoDrainage / Other 0 For Review

Allow background mapping to be seen in plot plans

It would be good to allow shapefiles and other background mapping to be visible when creating a plot plan. Otherwise the location of pipework etc has no context.
Guest almost 3 years ago in InfoDrainage / Other 1 Gathering support

Optional channel to river reachs option

The way ICM identifies the centre-line of the river reach is by using the point with the lowest invert level. Regardless of the shape of the channels of how much is the value of the X coordinate, didn't affect the appearance of the section to gene...
Liu Qiusheng almost 6 years ago in InfoWorks ICM / Network / River Modeling 0 Gathering support

Intelligently select nodes in river reaches

When clicking on a node over a subcatchment, the software can recognise the user is after the node. When the same is done for a node on a river reach, the node is not automatically selected but rather the choice is presented to the user.
Guest about 6 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Varying conduit/culvert shape along its length

When modelling irregular culverts, the shape of culvert usually varies along its length as well. EX: Culvert having 900mm dia at inlet, varies along its length and at outlet has 500mm. Can this be included in the options for transition of shape al...
Guest about 2 years ago in InfoWorks ICM / River Modeling 1 Gathering support

Make In-app sensor configuration editing easier

I want easier tools to streamline sensor editing. I want to select and modify a bunch of sensor aliases at pump stations and that's cumbersom with current workflows. I'd rather have a tabular interface where I could just move around and quickly edit.
Guest over 2 years ago in Info360 Insight / Sensor Configuration / Management 0 Gathering support

Approximate storage sizing for each individual SuDS /storage feature, so you can review the landtake for each solution and whether it would fit in the site without having to build a network model

Similar to Source Control
Guest over 2 years ago in InfoDrainage / Other 1 Already exists

Alert on river sections without having to make 1D results points

We'd like to create alerts on river sections without having to create either results points or having the reach split at the cross section in question
Richard Body over 6 years ago in InfoWorks ICM / Live Modeling / River Modeling 0 Gathering support

Water environmental capacity calculation

Add environmental capacity calculation in ICM, user can easily find how much pollution the river can receive at each time step and each river’s total environment capacity during the whole simulatiton. Water Environmental Capacity Calculation Backg...
Liu Qiusheng over 6 years ago in InfoWorks ICM / River Modeling / Water Quality 0 Gathering support