Skip to Main Content
Autodesk
ADD A NEW IDEA

Productivity

Showing 109

Create channel section lines from points

Survey data for river sections is often delivered as point data. To be able to create a model in ICM from this it needs to be converted into a line. This functionality was available in RS.
Guest almost 2 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Enable running stats templates via ruby script

We are running more and more simulations via ruby script but then have to manually run the stats reports, then export the results this is very time consuming. It would be very useful to be able to run the previously created stats templates from th...
Graham Millar about 1 year ago in InfoWorks ICM / API / Exchange 0 Gathering support

Show individual vertex points in the geoplan at all zooms

Vertices are only shown in the geoplan when zoomed in. It would be useful to see these at all zoom levels for cross sections and bank lines.
Guest almost 2 years ago in InfoWorks ICM / Productivity 0 Gathering support

Save toolbar and screen configurations and locations

I run InfoWorks on my laptop, and have an external monitor. I find I'm often searching for toolbar buttons because switching between the two monitors of different sizes re-configures the locations of the various toolbars and screens. For example,...
Dave White over 5 years ago in InfoWorks ICM / Productivity 4 Gathering support

Give a warning when copying between networks with different user defined defaults

when copying for example conduits between networks with flags #D for headloss and roughness, the values are adapted to the user defined values in the new network. This can be confusing.
Guest almost 2 years ago in InfoWorks ICM / Flags / Import data / Productivity 0 Gathering support

Cross section result view: keyboard shortcuts to go upstream or downstream

In the cross section result view (showing the water level), in RS there was the possibility to go upstream or downstream with PageUp/PageDwn, in ICM you have to right click to move upstream or downstream
Guest almost 2 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Be able to create selection lists using ICM Exchange from a list of Node or link IDs

No description provided
Guest over 4 years ago in InfoWorks ICM / API / Exchange / Productivity 1 Gathering support

UX: Allow decimal values without a leading zero

When adjusting values - you need to enter a leading zero to adjust by non-integer values. It would be nice to simply type '.5' if you need to lower by half a unit. The anticipation and early validation of the number is needless to toss a dialog bo...
Matt Anderson 7 months ago in InfoWorks ICM / Productivity 2 Gathering support

Support for more than two simulations in long sections

When evaluating the effects of raising and lowering roughness it would be helpful to display three or more simulations in the same long section; at the moment it is only possible to display 2.
Richard Body about 5 years ago in InfoWorks ICM / Long Section / Profile / Productivity / Results 0 Gathering support

Have all the functionality available in the 'Manage scenarios' dialogue in the ICM, to also be available via ICM Exchange

Options such as 'Reintegrate' & Duplicate'
Guest over 4 years ago in InfoWorks ICM / API / Exchange 0 Gathering support