Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 106 of 1442

simulation .elog file available via UI

Prior to ICM 2025, right clicking on the completed simulation > Open As would give access to the "simulation log", which contained useful details about the initialisation and failure reasons of the simulation. It would also contain diagnostics ...
Iain Scott 7 months ago in InfoWorks ICM / Results 1 Under consideration

Remote roots and move to server from Clould Database (ICM 2024.1 Ultimate)

Would be nice to have in the cloud database the option to set remote roots and be able to move the results so others would be able to see them (we don't want to lose time with re-runs)
Corneliu Martincu almost 3 years ago in InfoWorks ICM / Sharing 6 Gathering support

Add a result grid window for cross sections

Currently there is not a grid results window to show all cross sections. Would be helpful to have one. Also would be good if the grid window can show geometric elements of each cross section, such as bank levels, flow area, wetted perimeter, hydra...
Guest over 4 years ago in InfoWorks ICM / Grids / Results 0 Gathering support

Send simulations to cloud from on-prem database

It would be nice to be able to use the cloud computing capability that AutoDesk provides in the ICM Ultimate version 2024.1 not just for databases that are in the cloud, but also for databases that are on our own WDS by being able to choose the cl...
Marcel Glasbergen almost 3 years ago in InfoWorks ICM / Performance 0 Gathering support

Display PRN file results in user units

It would be great to see results of a PRN file using the user defined units rather than just native metric units.
Karen Chu 12 months ago in InfoWorks ICM / Results 1 For Review

Calculating volume storage on river reaches

In the application of ICM, we often count the regulation volume of river channels.But at the moment we can only calculatethe total available volume of channels/river reaches between two cross sections by using length and cross sectional areas.If t...
Guest over 5 years ago in InfoWorks ICM / Productivity / Results / River Modeling 0 Gathering support

Overhaul to the Hyperlinks system to allow attached data to be transportable

ICM and Infoasset databases offer a system that allow hyperlinked documents to be connected to the database. Primarily this to allow survey, as laid and other background data to be available to the user and is a powerful function that if used corr...
Guest over 4 years ago in InfoWorks ICM / Sharing / Transportables 2 Gathering support

Seamless Import/Export of Civil 3d pipe networks into ICM.

Seamless Import/Export of Civil 3d pipe networks into ICM. It just make sense now the companies are joined rather than having to work-around/manipulate data between the two.
Gregory Smith about 4 years ago in InfoWorks ICM / Data Exchange / Export Data / Import data / Sharing 3 In progress

Volume on a discharge graph with results section

When we display the graph of the discharge (flow through line) of a results section (line object), we don’t have access of the information about the volume (usually when we display a discharge graph, the volume is indicated at the bottom of the gr...
Guest almost 4 years ago in InfoWorks ICM / Results / Visualization 0 Gathering support

Zoom (flexible) graphs once x-axis values set

When using flexible graphs (including obsevered predicted, etc) in ICM, there is the possibility to specify the x-axis extents (i.e. time and date) explicitly via the data dialogues. However, once I have specified them this way, the traditional zo...
Iain Scott 11 months ago in InfoWorks ICM / Results 0 Gathering support