Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1370

Integrate w/Infor EAM

Specifically for City of Portland and City of Houston, would like to be able to integrate their data being collected in Infor including work order information.
Mike Maylone about 5 years ago in Info360 Asset / Other 1 Gathering support

InfoAsset Mobile - Dynamic sizing for map layer symbol

InfoAsset Mobile - Ability to set the size of the layer symbol dependent on the current zoom extent. Would like to make the symbols larger the closer in you zoom.
Lianne Rose over 1 year ago in Info360 Asset / Customization / Styling 4 Gathering support

Varying conduit/culvert shape along its length

When modelling irregular culverts, the shape of culvert usually varies along its length as well. EX: Culvert having 900mm dia at inlet, varies along its length and at outlet has 500mm. Can this be included in the options for transition of shape al...
Guest almost 2 years ago in InfoWorks ICM / River Modeling 1 Gathering support

I would like the option to model pump station that operate using VFDs.

I would like to be able to enter the full and reduced speed pump curves for each pump station that is controlled by variable frequency drives. In addition, I would need the set point or control that causes the pumps to ramp up to full speed.
Guest over 5 years ago in InfoWorks ICM / Pumps 0 Gathering support

Optional channel to river reachs option

The way ICM identifies the centre-line of the river reach is by using the point with the lowest invert level. Regardless of the shape of the channels of how much is the value of the X coordinate, didn't affect the appearance of the section to gene...
Liu Qiusheng over 5 years ago in InfoWorks ICM / Network / River Modeling 0 Gathering support

Ability to view and navigate to inspections directly from the Risk results table

See SAASAM-I-208 Include an Inspection ID column in the risk results table that contains link to the most recent inspection associated to the asset. This will enable more efficient navigation to the inspection data related that was used in the ris...
Tony Andrews almost 2 years ago in Info360 Asset 0 Gathering support

Intelligently select nodes in river reaches

When clicking on a node over a subcatchment, the software can recognise the user is after the node. When the same is done for a node on a river reach, the node is not automatically selected but rather the choice is presented to the user.
Guest almost 6 years ago in InfoWorks ICM / Productivity / River Modeling 0 Gathering support

Re-triggering CCTV association when the GIS is updated

Sometimes when the CCTV and GIS don't match, the problem is the GIS. In Info360 Asset users can find unassociated inspections so they have to update the GIS. When updating the GIS in Info360 Asset the inspection will not automatically re-associate...
Martha Nunez about 2 years ago in Info360 Asset 0 In progress

Add the Detailed EPASWMM LID Detailed Report file for ICM InfoWorks and SWMM Networks

Both ICM SWMM and ICM InfoWorks incorporate the EPASWMM's Low Impact Development (LID) or Sustainable Drainage Systems (SuDS) controls and Subcatchment features, offering a summary of LID inputs and outputs within the SWMM5 Report File (RPT file)....
Robert Dickinson about 2 years ago in InfoWorks ICM / SUDS 0 Gathering support

Add the Condition component option (from CCTV) as an option to be used under new categories.

This would be useful for users that want to have a separate category for one of the Condition fields (structural peak score, service score, etc). The reasoning is that we way that it is right now it forces the condition component to be depending o...
Martha Nunez about 4 years ago in Info360 Asset / COF & LOF Categories / Components / Risk Configuration / Calculation 0 Gathering support