Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1372

Add SWMM5 Ideal Pump to InfoWorks ICM

Does InfoWorks ICM have an equivalent to an ideal pump in SWMM which pumps whatever is entering the SPS out of the SPS? It would be a good feature to include into infoworks as I needed to play around a bit to get it. I found I had to add line 2 ...
Guest about 6 years ago in InfoWorks ICM / Hydraulics / Pumps 1 Gathering support

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap

Include a new conduit type for tile drains

Add a new conduit type to model tile drains or underdrains. These are common in agricultural fields and certain stormwater control structures. Currently, its difficult to model these since you can't account for the time it takes to infiltrate from...
Ryan Brown almost 3 years ago in InfoWorks ICM / Hydraulics 0 Gathering support

Remove the 'Admin' page for Viewer and Field Inspector users.

This is to prevent these users from accidentally editing this information without the Admin/Full access permission.
Martha Nunez almost 2 years ago in Info360 Asset 3 Already exists

Long Term Risk Projections for Budgeting and Showing CIP impact

Utilities want to be able to budget for the next 5, 10, 25, 50+ years. They also want to see what the effect of implementing a progressive asset management software like Info360 will have on their network. I would be great if the risk tool could d...
Tim Medearis almost 5 years ago in Info360 Asset 1 Gathering support

InfoWater Pro Valve Criticality Results in Info360 Asset

Details to be provided. In meantime see: https://youtu.be/ei1HKhbWCLo?si=rZoH4x8eqOb4GW_s
Tony Andrews almost 2 years ago in Info360 Asset 0 Under consideration

Work Order Close & Follow Up

No description provided
Mike Maylone almost 3 years ago in Info360 Asset / Work Management 0 Gathering support

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest almost 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Dissolve river reaches into multiple river reaches

It would be great to have the capability to generate automatically and perfectly snapped nodes in all/some of the X-sections of one/multiple river reaches in ICM and therefore split that river reach into various river reaches (kind of the opposite...
Guest almost 6 years ago in InfoWorks ICM / River Modeling 0 Gathering support

Info360 Asset - Condition Grade Profile

The condition grade profile is an extension to the scoring for CCTV surveys. In addition to the normal scoring (peak scores, etc.) a survey can be broken down into grades. The percentage of grades present from 1 to 5 can be calculated for each pip...
Tony Andrews almost 3 years ago in Info360 Asset 0 For Review