Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 125 of 1370

WS Pro to allow for maxconc at node/hydrant

No description provided
Guest over 5 years ago in InfoWorks WS Pro / Water Quality 1 Gathering support

Option to display in the same time assignments of properties to nodes and to pipes

Add an option to map to display in the same time assignments of properties to nodes and to pipes. At the moment it is not possible as the 'Customer Point Demand Assignment' option is a radio button.
Guest over 5 years ago in InfoWorks WS Pro 1 Will not implement

A simple way to straighten short links to display symbols more clearly

When using the "Expand Short Links" option I find that the expanded links will inherit some geometric points from the adjacent links, and hence symbols for valves, meters etc may not display too well if adjacent to a pipe bend. It would be useful ...
Owen Lewis over 5 years ago in InfoWorks WS Pro / Other 1 Gathering support

I want to be able to see what connected Agents are doing and trouble shoot connections from within WS Pro

A command centre program for WS Pro/IWLive runs which shows connected agents and marshallers and all the runs in a simulation workgroup in one place. Better simulation workgroup diagnostics. I am trying to trouble shoot remote VPN issues and the ...
Ann Pugh over 5 years ago in InfoWorks WS Pro 0 Will not implement

Populate Pump run schedule based on telemetry data in WS Pro

As a planning modeler calibrating within WS Pro, I want to use the "Load from Live Data" tool on pumps in Plan mode to populate the Control Data timeseries profile based on a data stream of 1's and 0's indicating on/off. While this is already avai...
Guest over 4 years ago in InfoWorks WS Pro / Telemetry 0 Gathering support

HGL levels without nodes on links(pipes)

There is a scenario in which the water mains reach the top of a hill(pumping to reach the top) and then the water just drives by gravity to a storage tank. Instead of having multiple nodes in between to give the exact hydraulic grade levels, an op...
Rajesh Gaddam over 1 year ago in InfoWorks WS Pro / Productivity 2 Gathering support

Integrate the GMR runs to database and IWLive export style

Integrate the GMR runs to database and IWLive export style:1- Get data from database as initial values.2- Export GMR results to external database.
Mahmoud Abualrub over 1 year ago in InfoWorks WS Pro / Data Exchange 2 Gathering support

WS Pro control should be based on current time step

Add option in WS Pro so that control status of objects is controlled by the flow solution in the current time step, not the previous time step. The way WS Pro currently works, with the control based on the previous TS often results in pump on/off ...
Haddon Smith over 4 years ago in InfoWorks WS Pro / Engine 0 Gathering support

Multiple control options

Assets with controls (Pumps, PRVs etc.) should have multiple control options. So Control 1 could be a control regime applicable to model calibration. Control 2 could be control relevant to a General Applications model, Controls 3, 4, 5 etc c...
Guest almost 5 years ago in InfoWorks WS Pro / Productivity 1 Already exists

Consistency in Plots Titles for Simulation and Live Data Plot Reports

Consistency in Plots Titles for Simulation and Live Data Plot Reports In Graph tool plot title include ‘Asset ID’ and ‘Node ID’ e.g. “Hausegill SR (Reservoir: 004T4011)”. However in the Simulation report in only shows ‘Node ID ‘ e.g. ”004T4011” C...
Guest about 5 years ago in InfoWorks WS Pro / Other 0 Gathering support