Skip to Main Content
Autodesk
ADD A NEW IDEA

Clear

Ideas

Showing 266 of 1370

Apply direct inflows to permeable paving

There should be a way of applying the inflow that the paving receives directly (i.e. the rain that falls onto it) to produce a more accurate simulation of the rainfall. This direct rainfall isn't a lateral or point inflow, and being forced to mode...
Craig Bobbett 10 months ago in InfoDrainage / Hydraulics 0 For Review

Exclude specific elements from Numbering Scheme (flow paths, manholes, simple junctions, etc).

Be able to have only manholes in the manhole schedule, without any missing manhole numbers. Junctions can be named separately and not included. Enable large sites with multiple areas to have their different areas named a different way easier.
Guest over 1 year ago in InfoDrainage / Auditing / Reviewing 2 Gathering support

Update downstream pipes

It would be useful to have an option to upsize downstream pipes automatically (just like microdrainage). For example, if i increase pipe size the corresponding downstream pipes should upsize accordingly so not to cause a restriction. At the minute...
Guest over 2 years ago in InfoDrainage / Productivity 2 Already exists

Allow underdrains to be displayed in the connection tables and add pipe number to them

It is very difficult to create a quick and logical pipe schedule when pipes such as underdrains are hidden in the SuDS nodes and their upstream invert level needs to be calculated manually. Please add the underdrains to the connection tables with ...
Iwona Savas 11 months ago in InfoDrainage 0 For Review

Infiltration Trench using BRE DIGEST 365 method

The software needs to support for designing Infiltration trench method by using “BRE DIGEST 365”. I have checked the comparison between Infodrainage analysis Vs BRE digest 365 (manual calculation) and the results are not matching. Most of the proj...
Guest almost 2 years ago in InfoDrainage / Hydraulics 8 Gathering support

Swale with pipe under connected by manholes

Could not model real-life scenario where the pipe was under as conveyance for lesser events and raised via vented manholes into the swale above. Need integrated solution and was unable to model both and connect via manholes.
Guest almost 2 years ago in InfoDrainage / Hydraulics 1 Already exists

Support for LACP v7 and v8

This is a request for support for LACP CCTV Management in Info360 Asset.
Martha Nunez almost 3 years ago in Info360 Asset / CCTV Standards (e.g. PACP) / Rehab actions & cost 1 On roadmap

When Survey Length is Different than pipe length, do not give a warning unless it is larger than 5ft difference.

Many inspections end up with warnings when this very common issue comes up. Most of the time survey length and pipe length will be different because the GIS is not 100% perfect.
Guest almost 3 years ago in Info360 Asset / Inspection & Media Management Workflows 1 Gathering support

Correct resizing of pop-up windows activated through C3D toolbar

Due to issues with my eyesight I use the accessibility settings on my computer to increase the standard text sizes for applications. When using the InfoDrainage toolbar in Civil 3D pop-up menus don't resize to match the updated display settings. I...
Michael McWhinnie about 1 year ago in InfoDrainage / Other 0 For Review

Info360 Asset support multi-sensor inspections

Examples include pipe penetrating radar, sonar, CCTV, LIDAR, side-scan etc. Read https://trenchlesstechnology.com/advancements-in-multi-sensor-inspection-technologies-for-large-diameter-sewers/ Vendors of equipment and software include: https://se...
Tony Andrews about 1 year ago in Info360 Asset / Inspection & Media Management Workflows 0 Gathering support